Page 52 - TCDB combined Book
P. 52

28                       The Complete Design-Builder


               Company Brochure:





                 DCL










                                                                 P PR RO OJ JE EC CT T   T TE ES ST TI IM MO ON NI IA AL LS S






                       Mr. J. Smith President ABC manufacturing....….We were very satisfied
                       with the efficient manner in which DCL completed our new facility. The
                       cooperation of their staff and design people dealing with the numerous
                       changes we made throughout construction is commendable.  It is without
                       hesitation that we recommend DCL for anyone considering using Design-
                       Build services.




                       Mr. B. Jones President ACE Wholesalers..............This is the second project
                       completed by DCL for our company. Our critical time schedule and the
                       importance of minimum disruption to our operation during the construction
                       were accomplished without a hitch. Should we require Design-Build services
                       in the future we will certainly be contacting DCL.




                       Mr. B. Brown President Automotive Plaza.............Our project offered some
                       special design considerations due to site restrictions and multi-tenancy
                       requirements. DCL put together a Design-Build team that resulted in an
                       efficient and attractive building, completed on time and within budget. The
                       cooperation and ease of dealing with the DCL team will make them a likely
                       choice on any future projects.
   47   48   49   50   51   52   53   54   55   56   57