Page 7 - PANEL CUBB SDD
P. 7
1 2 3 4 5 6 7 8
A
A
CABLE STATUS RECTIFIER
B CABLE 10 CORE
COM+48VDC B
X1.1 - (Hitam) XDX2.13 - (Hitam)
AC FAIL
X1.2 - (Ungu) XDX2.47 - (Ungu) BATT FAIL
X1.6 - (Coklat) XDX2.46 - (Coklat)
RECT FAIL
C
X1.8 - (Orange) XDX2.45 - (Orange) POWER +12VDC C
X1.9 - (Merah) XDC.3 - (Merah)
POWER -12VDC
X1.10 - (Merah) XDC.4 - (Kuning)
SPARE
D
Spare - (Putih) Spare - (Putih) SPARE D
Spare - (Kelabu) Spare - (Kelabu)
SPARE
Spare - (Biru) Spare - (Biru)
SPARE
Spare - (Kuning) Spare - (Kuning)
E
E
00 Issued For Approval 02/02/22 ARRY Prepared. ARRY Project name Customer Based on Ref. designation = Lang. Scale.
F 01 Issued For Approval 08/02/22 ARRY Checked SEPTA SLD CONECTION PT. PLN PERSERO Document kind External doc.id
CABLE
02 Issued For Approval 25/02/22 ARRY Approved SEPTA Resp. PT. ARHADI FAJAR Tittle. SHEET DIAGRAM Document Id. DCC Page. Cont. Page F
Ref Description Date Name Date Prep.29/02/22 Work order id. REVP01 PERKASA PANEL CUB ID-PAFP0O2 &ELH 01 01
1 2 3 4 5 6 7 8