F30 Accessories/ sundry items for brick/ block/ stone walling

            CAVITIES

  110 CONCRETE FILL TO BASE OF CAVITY
        • Concrete generally: To BS EN 206-1 and BS 8500-2.
             - Designated concrete: site specific dependant on ground conditions.
                      Workability: High.
        • Extent: Maintain 75 mm between top of fill and external ground level and a
            minimum of 225 mm between top of fill and ground level dpc.
        • Placement: Compact to eliminate voids.

  120 CLEANLINESS
        • Cavity base and faces, ties, insulation and exposed dpcs: Free from mortar and
            debris.

  132 PERPEND JOINT PLASTICS WEEP HOLES
        • Manufacturer: Contractor's choice .
             - Product reference: Contractor's choice .
        • Locations: Through outer leaf immediately above base of cavity, at cavity trays,
            stepped dpcs and external openings.75 mm above top of cavity fill at base of
            cavity.
        • Provision: At not greater than 1000 mm centres and not less than two over each
            opening.

  150 FULL FILL CAVITY INSULATION
        • Insulation: Rock wool batts.
             - Standard: BS EN 13162.
             - Product certification: British Board of Agrement (BBA).
        • Manufacturer: Contractor's choice.
             - Product reference: Contractor's choice.
        • Recycled content: Submit proposals.
        • Face size (nominal length x width): appropriate to suit site specific details.
        • Thickness (nominal): min 60 mm - site specific to suit thermal requirements.
        • Thermal conductivity: typically 0.035 W/mK - site specific .
        • Reaction to fire class: A1.
        • Additional requirements: None.
        • Placement: Continuous and free of mortar and debris.

RotF generic (intermediate) NBS 2014  6118-AEW-XX-XX-NBS-A-01