Page 220 - McD_6118-AEW-XX-XX-NBS-A-001_Neat
P. 220

660 SIDE ABUTMENTS
      • Underlay: Turn up not less than 100 mm at abutments.
      • Abutment slates: Cut as necessary. Fix close to abutments.
      • Soakers: Interleave with abutment slates. Fix by turning down over head of
          abutment slates.

670 TOP EDGE ABUTMENTS
      • Underlay: Turn up not less than 100 mm at abutments.
      • Top slate courses: Fix close to abutments.

675 TOP EDGE VENTILATED ABUTMENTS
      • Underlay: Provide air gap at abutment as recommended by ventilator
          manufacturer.
      • Abutment ventilator:
          - Manufacturer: Contractor's choice.
             Product reference: Contractor's choice.
          - Fixing: As recommended by manufacturer.

700 DRY VENTILATED TILE RIDGES
      • Underlay: Provide air gap at apex as recommended by ridge tile manufacturer.
      • Dry ridge fixing battens: site specific.
      • Dry ridge tiles:
          - Manufacturer: Contractor's choice.
             Product reference: Contractor's choice .
      • Ridge terminals:
          - Manufacturer: Contractor's choice .
             Product reference: Contractor's choice .

840 VENTILATOR SLATES
      • Ventilator slates:
          - Manufacturer: Contractor's choice.
             Product reference: Contractor's choice.
          - Requirement: To ventilate roof void; site specific.
          - Positions: site specific.

VERTICAL SLATING EDGES/ JUNCTIONS

910 BOTTOM EDGES
      • Slating substrate work: Fix timber tilting fillet to support bottom course of slates in
          correct vertical plane. Fix flashing to tilting fillet.
      • Underlay: Dress over flashing.
      • Undercourse and bottom course slates: Fix with tails neatly aligned.

920 TOP EDGES
      • Top slate courses: Fix under abutment and make weathertight with flashings
          dressed down not less than 150 mm.

930 SIDE ABUTMENTS
      • Slating substrate work: Chase abutment wall and insert stepped flashing.
          - Flashing: Return not less than 75 mm behind slating, overlapping underlay and
             battens. Turn back to form a vertical welt.
      • Abutment slates: Cut and fix neatly.

RotF generic (intermediate) NBS 2014                             6118-AEW-XX-XX-NBS-A-01
   215   216   217   218   219   220   221   222   223   224   225