L10 Windows/ Rooflights/ Screens/ Louvres

GENERAL

110 EVIDENCE OF PERFORMANCE
      • Certification: Provide independently certified evidence that all incorporated
          components comply with specified performance requirements.

115 TIMBER PROCUREMENT
      • Timber (including timber for wood based products): Obtained from well managed
          forests and/ or plantations in accordance with:
          - The laws governing forest management in the producer country or countries.
          - International agreements such as the Convention on International Trade in
             Endangered Species of wild fauna and flora (CITES).
      • Documentation: Provide either:
          - Documentary evidence (which has been or can be independently verified)
             regarding the provenance of all timber supplied.
          - Evidence that suppliers have adopted and are implementing a formal
             environmental purchasing policy for timber and wood based products.

120 SITE DIMENSIONS
      • Procedure: Before starting work on designated items take site dimensions, record
          on shop drawings and use to ensure accurate fabrication.
      • Designated items: site specific .

150 DAYLIGHT PERFORMANCE
      • Daylight calculations: In accordance with BS 8206-2, CIBSE 'Lighting guide LG10'
          and BRE 'Site layout guide'.
      • BREEAM requirements:
          - Submit: Daylight performance schedule and Design plans for each floor in the
             building with each room/ area showing isolux contours indicating point daylight
             factor values.
          - Calculations showing: Average daylight factor expressed as a percentage for
             each room/ area and Minimum point daylight factor expressed as a percentage
             for each room/ area.

155 VIEW OUT
      • Windows/ opening sizes and position: Design to meet BREEAM 'View out' criteria for
          relevant building type.
      • Submit design plan and elevation drawings showing the following:
          - All BREEAM defined 'relevant areas' dependent on building type and room
             depths.
          - Actual or notional workstation/ desk layouts.
          - Window/ open areas.
      • Submit site plan showing: Building location and proximity to external obstructions.

160 POTENTIAL FOR NATURAL VENTILATION
      • Submit design plan and elevation drawings, and calculations confirming the
          following: Locations of openings and Types of windows/ ventilators and total
          openable areas.

RotF generic (intermediate) NBS 2014       6118-AEW-XX-XX-NBS-A-01