776 EXPOSED OPENINGS IN INSPECTION CHAMBERS, ACCESS POINTS, FITTINGS AND
          EQUIPMENT

      • General: Fit purpose made temporary caps. Protect from site traffic.

          COMPLETION

901 REMOVAL OF DEBRIS AND CLEANING
      • Preparation: Lift covers to manholes, inspection chambers and access points.
          Remove mortar droppings, debris and loose wrappings.
          - Timing: Before cleaning, final testing, CCTV inspection if specified, and
             immediately before handover.
      • Cleaning: Thoroughly flush pipelines with water to remove silt and check for
          blockages. Rod pipelines between access points if there is any indication that they
          may be obstructed.
      • Washings and detritus: Do not discharge into sewers or watercourses.
      • Covers: Securely replace after cleaning and testing.

903 TEMPORARY MEASURES
      • Water used to stabilize tanks and the like during installation: Drain.

911 TESTING AND INSPECTION
      • Dates for testing and inspection: Give notice.
          - Period of notice: 10 working days.

921 FINAL TESTING OF PRIVATE GRAVITY DRAINS AND SEWERS UP TO DN 300
      • Before testing:
          - Cement mortar jointing: Leave 24 h.
          - Solvent welded pipelines: Leave 1 h.
      • Standard: To Building Regulations.
      • Method: to be agreed.

941 WATER TESTING OF MANHOLES AND INSPECTION CHAMBERS
      • Timing: Before backfilling.
      • Standard:
          - Exfiltration: To BS EN 1610.
             Method: Testing with water (method W).
          - Infiltration: No identifiable flow of water penetrating the chamber.

951 TESTING OF ANCILLARY COMPONENTS
      • Components: Petrol interceptors and Foul water storage tanks.
      • Standard: To BS EN 1610.
          - Tests: Exfiltration.
             Method: to be agreed.