Page 538 - McD_6118-AEW-XX-XX-NBS-A-001_Neat
P. 538

ANCILLARY CONSTRUCTIONS AND WORK

800 CLEANING
      • General: Thoroughly flush out the whole of the installation with clean water to
          remove silt and debris immediately before handover.
      • Washings and detritus: Dispose of safely. Do not discharge into sewers or
          watercourses.

RotF generic (intermediate) NBS 2014  6118-AEW-XX-XX-NBS-A-01
   533   534   535   536   537   538   539   540   541   542   543