Page 96 - McD_6118-AEW-XX-XX-NBS-A-001_Neat
P. 96

220 BEAM AND MASS CONCRETE PIER UNDERPINNING
      • Beams: Contractor's choice.
          - Size: site specific.
          - Location: site specific.
      • Piers:
          - Depth: site specific.
          - Length: site specific.
          - Width on either side of wall centre line (minimum): site specific.
          - Depth of hard pack: site specific.
          - Gap face to face of piers (maximum): site specific.
      • Materials:
          - Concrete: site specific.
          - Hard packing: site specific.
             Water content: Sufficient only to ensure that packing binds together.
      • Curing period (minimum):
          - Between casting underpinning block and pinning up: site specific.
          - Between completion of pinning up and commencement of excavation for the
             next sequence of underpinning: site specific.
             Extend curing periods to allow for inclement weather.
      • Drains/ Services: Locate piers to avoid. Give notice if drains/ services will pass
          through beams.
      • Features: site specific.

          TYPES OF PILING

310 PILES
      • Standard: To SPERW, sections B2–B6, as appropriate to the pile type.
      • Permitted types: Contractor's choice.
      • Project specification: Submit proposals to cover the requirements of SPERW in
          clause B1.2 and listed under this heading for the chosen pile type.
      • Other requirements: None.

          ACCESSORIES FOR UNDERPINNING

410 PRECAST CONCRETE BEAMS
      • Standard: BS EN 13369.
      • Type: Contractor's choice.
          - Composite action: Permitted.
      • Details:
          - Cross section: Submit proposals.
          - Lengths: Submit proposals.
          - Loading conditions: Submit proposals.
      • Exposure conditions: site specific.
          - Cover to reinforcement/ tendon (minimum): To suit exposure conditions.
          - Protective treatment to end of beams: site specific.
      • Cutting on site: Saw cutting permitted.
      • Hard packing:
          - Depth: site specific.
          - Material: site specific.
          - Curing period (minimum): site specific.

RotF generic (intermediate) NBS 2014  6118-AEW-XX-XX-NBS-A-01
   91   92   93   94   95   96   97   98   99   100   101