Page 91 - McD_6118-AEW-XX-XX-NBS-A-001_Neat
P. 91

250 ASSEMBLING AND INSTALLINGgenerally
      • Fixings: As recommended by container manufacturer.
          - Individual ties of lacing wire: Do not use.
      • Assembly:
          - Starting from top corner join edges of adjacent panels together in a continuous
             operation.
          - Join to adjacent units, above, below and on all sides.
          - Provide all internal bracing, pre-tension mesh.
      • Installation:
          - Vertical joints: Staggered in adjacent courses.
          - Lifting and placing of prefilled units: Use lifting frames and remove on
             completion.
          - Stepped constructions: Align bottom edge wire of upper baskets with a
             longitudinal wire of mesh of lower baskets. Provide continuous lacing along all
             horizontal joints at front and rear of wall.
      • Filling:
          - Maintain shape of basket during filling.
          - Fill to full height in sequence recommended by manufacturer.
          - Top mesh: To bear upon fill.
          - Lid: Fix securely.
      • Backfill: Place and compact at each course as work proceeds.

260 ASSEMBLING AND INSTALLING BASTIONS
      • Fixings: As recommended by container manufacturer.
          - Individual ties of lacing wire: Do not use.
      • Assembly:
          - Starting from top corner join edges of adjacent panels together in a continuous
             operation.
          - Join to adjacent units, above, below and on all sides.
          - Pre-tension mesh.
      • Filling: Fill to full height in sequence recommended by manufacturer.
      • Backfill: Place and compact at each course as work proceeds.

330 GEOGRID REINFORCEMENT
      • Manufacturer: Contractor's choice.
          - Product reference: Contractor's choice.
      • Foundation condition at time of laying reinforcement: Clean and level with no
          debris, projections, organic matter, soft material or material liable to damage the
          reinforcement.
      • Laying reinforcement:
          - Backfill: Bring up to level and compact before installing each layer of
             reinforcement.
          - Jointing: Neatly abut adjacent sheets and connect to blocks as recommended
             by block manufacturer. Do not protrude from front face of wall.
          - Tensioning: Lay a minimum of two further courses of blocks and lightly tension the
             reinforcement before placing and compacting the next layer of backfill
             material.

RotF generic (intermediate) NBS 2014  6118-AEW-XX-XX-NBS-A-01