660 EASING OF PILE DRIVABILITY
      • Usage: Submit proposals and details of effects on pile bearing capacity.

696 METHOD OF PLACING PILE FILLING
      • Designation: All.
          - Requirement: site specific.

700 PLACING FILLING IN DRY BORINGS AND CASINGS
      • Requirements additional to SPERW, clause B3.5.2.3:
          - Height of lower end of delivery tube above bottom of reinforcement cage
             (maximum): site specific.
          - Free fall of concrete (maximum): site specific.

720 PREPARATORY PREBORING FOR LOW FRICTION SLEEVING OR SURROUND
      • Requirement: Carry out to base of low friction treatment.
      • Preboring diameter: to suit sleeving.

745 TESTING MORTAR AND CEMENT GROUT
      • Standard: BS EN 445.
          - Exceptions: Strength test using 100 mm cubes.
      • Preliminary tests: Required if satisfactory evidence of mix suitability is not available
          from other sites..
      • Frequency of compliance testing: As BS EN 446, clause 8.4.

755 PREPARATION OF PILE HEADS FOR INTEGRITY TESTING
      • Preparation: To suit test method.
      • Inconsistencies: Submit report on inconsistencies which could inhibit execution or
          interpretation of test.

760 PILE INTEGRITY TESTING - GENERAL
      • Method: Submit proposals.
          - Satisfactory evidence in support of proposals: Submit.
      • Period between casting and testing (minimum): 7 days.
      • Pile group designation: All.
          - Number of piles to be tested: 25%.
          - Locations: One in each pile group, and any other pile where construction
             anomalies have been noted.
      • Programme: site specific.
      • Other requirements: site specific.

780 AXIAL MAINTAINED LOAD TESTING OF PRELIMINARY PILES
      • Type of test: site specific.
          - Initial proof load test: site specific.
          - Completion of test: To maximum test load or failure to stabilise as SPERW, clause
             B15.13.3.
      • Pile group designation: All.
          - Test pile construction: As for working piles.
             Location: site specific.
          - Number of piles to be tested: site specific.
          - Test load (maximum): site specific.
      • Special requirements: site specific.