Page 81 - McD_6118-AEW-XX-XX-NBS-A-001_Neat
P. 81
EXECUTION
635 INSTALLING PLASTICS DEPRESSURIZATION SUMPS
• Position: 15 m maximum from farthest point of area served.
• Area served (maximum): 250 m².
• Base: Compacted hardcore.
- Thickness: 125 mm.
• Blinding: Sand.
- Thickness: minimum 35 mm.
640 INSTALLING VENTING HARDCORE LAYERS
• Filling: Spread and level in 150 mm maximum layers. Thoroughly compact each
layer whilst maintaining enough voids to allow efficient venting.
650 LAYING HORIZONTAL GEOCOMPOSITE GAS VENTING LAYERS
• Base: Venting hardcore layer.
• Jointing: Butt joint. If the geocomposite material includes an integral gas retardant
membrane, make gastight joints.
• Fitting: Cut neatly around pile caps, other obstructions or service penetrations.
655 APPLYING VERTICAL GEOCOMPOSITE GAS VENTING LAYERS
• Apply: Outside external waterproofing membranes.
• Substrate: site specific.
• Condition of adjoining surfaces: Clean and dry.
• Jointing method: Double welted joints sealed with waterproof adhesive.
COMPLETION
910 INSPECTION OF GROUND GAS COLLECTION AND VENTING SYSTEM
• Notice for inspection (minimum): 5 days.
• Defects: Report immediately.
920 DOCUMENTATION
• Operation and maintenance instructions: Submit.
• Record drawings: Submit.
- Number of copies: 2.
RotF generic (intermediate) NBS 2014 6118-AEW-XX-XX-NBS-A-01