Page 42 - McD_Aircharge Contractors Installation Guide v4
P. 42

Page 40
                                                                  PoD

                                                   Drilling Instructions




                                             Drilling of M5 clearance holes for the Aluminium
                                             Orb Holder using a power drill and 5.5mm drill bit















                                                                                                Counter should
                                                                                                be protected
                                                                                                with masking
                                                                                                tape prior to
                                                                                                drilling of this
                                                                                                hole.
   37   38   39   40   41   42   43   44   45   46   47