Page 45 - McD_Aircharge Contractors Installation Guide v4
P. 45

Page 43

                          PoD ‘Top Fixing’ on MMM Bars (Corian Surface)


                                                     Hole Drilling Details



            To avoid ‘splitting’ the Corian surface it is recommended that the self tapping screw only screws into the MDF sub surface.







      Diagram 5





































                                Please also refer to the ‘Point of Display (PoD) Top Fixing Exploded Assembly View’
   40   41   42   43   44   45   46   47   48   49   50