Page 170 - B6118-AEW-XX-XX-PP-A-0001_(P19)_Contractors Manual
P. 170
DESIGN
D7 Back of House (Interior)
D7.1 Kitchens Walls
3mm hygienic cladding (in grey or white – as
Kitchen equipment layouts will change for specified per project) with all proprietary fixing
all restaurants through the CotF projects. The strips, covers and coves.
initial kitchen design will be completed by the
architect. Following DWG approval, the drawing
will be issued to McDonalds kitchen supplier, Ceiling
H+K International. The H+K kitchen drawing will 600x600mm Satin Spar concealed grid modular
then be incorporated + co-ordinated by the ceiling with downward tile access.
architect into the construction drawings. Any
physical changes to the kitchen space should All lighting by LAUK.
be coordinated by the architect.
Older restaurants are likely to have 600x600mm
Specification of finishes may change at a Burgess push in ceiling tiles in a concealed
restaurant specific level; however the following 15mm grid.
should be expected in existing situations:
Doors
Floor Solid core with hardwood lippings. Balanced
200x200mm Secura Everest anti slip tiles, 4mm laminate, polyrey cream to both sides. Vision
grout joint, EG8 Grey from Vogue Ceramics. panel required.
Installation as specification contained within Ironmongery
Construct section including epoxy grout. All ironmongery to SAA or stainless steel including;
300mm kick plates, D type pull handle, push
100mm x 200mm ceramic skirting tile for all walls plate, door closer, door stop, 3 sets of hinges.
prior to wall finishes beginning
Where finishes are to be renewed, agreement
to be obtained from McDonald’s project
manager for those to be implemented.
D7.1 Kitchens 5.0 25 July 2017