A
A.8 Floor pop-ups
The plan below indicates the drainage pop-ups to the lean store which should be
part of the shell of the building.
One generic pop up has been shown to each run of refrigeration on the shop
floor and a further pop-up for the Costa pod unit.
A.8 Floor pop-ups 1.0 25th March 2019