Page 122 - CRS Engineering
P. 122
iii) If tank quality for classification as RAT YES
B) Tank Bund
i) Is the top level of the bund unifornn and Yes
as oer the standards?
ii) Is the top width of the bund as per Yes
standards?
iii) Are the slopes as per the standards? Yes
iv) Any dangerous gullies or scour of the No
bund?
C) Surplus Weir
i) Condition -
ii) Is the Length adequate for Design -
discharae?
iii) Is Danger Level marked Yes
D) Condition of the Sluices Yes
E) Any Past history of Breach of the -
tank if so, details.
V B) iv)
Assistant Executive Engineer, Deputy^x^cufiVfe Engineer,
Irrigation Section, Irrigation Sub-Division,
SRIKALAHASTI. SRIKALAHASTI.
Assistant Divisional Engineer,
South Central Railway,
RENIGUNTA.