5.13 USFD Progress for the Month of January-2021
Sl. No. Description Total
DDRT = 8
1 No. of Machines SRT = 1
DWT = 9
2 Monthly Target In km 741
3a Rails Tested in km 420
3b Welds Tested in km 110
4 Shortfall 210
5 Cumulative Progress in kms : 7163
5a Rails Tested in km 5108
5b Welds Tested in km 2055
6 IMR 3
7 OBS 19
8 IMRW 4
9 OBSW 20
10 DFWO 10
11 DFWR 0
5.14 Annual Scope and Progress up to January-2021
Total Scope Progress up to
Sl. No. Type of Testing
in KM JAN-2021
1 Rails (NBC & GFC) 5007 4247
2 Test Free Rails 592 495
3 Winter Precautions 350 254
4 Points & Crossings 285 44
5 Loop Lines 267 39
6 SEJ 51 0
Scabbed Rails /Flat Tyre/Wheel
7
Burnt Rails 60 30
8 Service Welds 1267 1311
9 High Banks / Cuttings 75 63
10 Curves 75 63
11 DFWO 210 149
12 New Welds (OL) 400 254
13 New Welds (Agency) 0 0
14 New Welds (Construction) 50 77
15 Fracture Prone (FBW) 110 0
16 Fracture Prone (SKV) 2 2
17 Major Bridges & Approaches 90 137
Total 8891 7163