Page 27 - CRS Engineering
P. 27

\ A       o.ol svuv^^                      Sma.'s.
                                                        A)Ch@356m 2)898m\s
                     Innation ofSluices
                 I


                      4\amvu\\\ u'e'sv^w u«i\jvv<3.\u\i  \
                                                          Funcfeona\, B\i\SA\i\ceHo V\s vequ\Ted
                  4   Functional or Not                    reconstruction.

                  V   A. Inspection Details.
                      i)Date of Inspection                 08.02.2020
                       ii)Name and Desingation of
                                                           Sri. C.WILSON BABU ADEN/RU
                       Insoectinq Officials
                                                           Sri.M. Babu DEE. 1&CAD ,       ^ 0 ^2-1 Ofi ^ 2-7

                       iii)lfthe Tank qualify for
                                                           Yes
                       classification as RAT.

                       B.Tank Bund

                       i)ls theTop level of the Bund       Yes
                       uniform and as per the Standards.
                       ii)is theTop width of the bund as
                                                           Yes
                       oer standards.
                       iii)Are the slopesas perthe
                                                           Yes
                       standards
                       iv)Any otherdangerousgullies or
                       <;nniir of the bund                 No
                       •.Surplus weir
                       i)Condtion                          Good
                       ii)is the length adequate for design
                       discharqe?                          Yes

                       iii) Is the dangerous level marked  Yes
                       D.Condition of the sluices          Reconstruction of sluice No 1 is required.
                                                           The tank bund breached during floods in 10/2001 and
                                                           in 11/2015 the tank surplus weir body wall washed
                       E.Any Past History ofBreach ofthe   awayand solid apron also badly damaged. Now the
                       Tank Bund and Ifso details.         Tank Bund and Surplus weir also restored to its Ml
                                                           standards under Neeru chettu programme 2017-18




                                                                                     i.

                                                                            »pul>^E>»cu»rt fc?h5!r(«s«ii
                                                                           0«pul»\E»»cu*v*  tr^irieoi  V
                                                                                        r>AAArfmf*<;
                                                                            k...
                                                                          W«ttr Resources Defartrtift,  •
                                                                 Signaturltl9rtlTt4^B'^'8^'isignation of
                 Signature with Name &Designation
                 of Railway Official.                                       Irrigation Official.
                                                                                       •V




                                                                                       sn/y^
   22   23   24   25   26   27   28   29   30   31   32