Page 27 - CRS Engineering
P. 27
\ A o.ol svuv^^ Sma.'s.
A)Ch@356m 2)898m\s
Innation ofSluices
I
4\amvu\\\ u'e'sv^w u«i\jvv<3.\u\i \
Funcfeona\, B\i\SA\i\ceHo V\s vequ\Ted
4 Functional or Not reconstruction.
V A. Inspection Details.
i)Date of Inspection 08.02.2020
ii)Name and Desingation of
Sri. C.WILSON BABU ADEN/RU
Insoectinq Officials
Sri.M. Babu DEE. 1&CAD , ^ 0 ^2-1 Ofi ^ 2-7
iii)lfthe Tank qualify for
Yes
classification as RAT.
B.Tank Bund
i)ls theTop level of the Bund Yes
uniform and as per the Standards.
ii)is theTop width of the bund as
Yes
oer standards.
iii)Are the slopesas perthe
Yes
standards
iv)Any otherdangerousgullies or
<;nniir of the bund No
•.Surplus weir
i)Condtion Good
ii)is the length adequate for design
discharqe? Yes
iii) Is the dangerous level marked Yes
D.Condition of the sluices Reconstruction of sluice No 1 is required.
The tank bund breached during floods in 10/2001 and
in 11/2015 the tank surplus weir body wall washed
E.Any Past History ofBreach ofthe awayand solid apron also badly damaged. Now the
Tank Bund and Ifso details. Tank Bund and Surplus weir also restored to its Ml
standards under Neeru chettu programme 2017-18
i.
»pul>^E>»cu»rt fc?h5!r(«s«ii
0«pul»\E»»cu*v* tr^irieoi V
r>AAArfmf*<;
k...
W«ttr Resources Defartrtift, •
Signaturltl9rtlTt4^B'^'8^'isignation of
Signature with Name &Designation
of Railway Official. Irrigation Official.
•V
sn/y^