Page 29 - CRS Engineering
P. 29
V (a. inspection Details.
i)Date of Inspection 08.02.2020
ii)Name and Desingation of
Sri. C.WILSON BABU ADEN/RU
Inspecting Officials
Sri.M. Babu DEE, 1& CAD
iii)if the Tank qualify for
classification as RAT. Yes
B.Tank Bund
i)ls the Top level of the Bund uniform Yes
and as per the Standards.
ii)ls the Top width of the bund as per
standards. Yes
iii)Are the slopes as per the
standards Yes
iv)Anyother dangerous gullies or
scour of the bund No
C.Surplus weir
i)Condtion Good
ii)is the length adequate for design
discharge? Yes
iii) Is the dangerous level marked Yes
•.Condition of the sluices Good
E.Any Past History of Breach of the
Tank Bund and If so details. -
I
CQrK/^^'2^26 fi«|juI)\IEn»cuvv« fcj^»n!w» Y>1 'y iJEVb
er Resources Deoartmett!
Water Rtsources Departmett I
Signature with Name & Designation Signatur#«Hrt^Sjlh%#.^|}fJf!fe^^ of
of Railway Official. Irrigation Official.