.QRTHEANNUAI|NSPFaiONTRrWAYrFFrTI».TANKSFORYEARENDINGWITH.



                   District
                                                                       Inugunta
                   Village                                             InuguntaTank
                ThomP nftheTank bunded water source
                   mame ui tn^
                 ^
                                                                       115
                Aumber ofthe Dist. Map ot Railway Affecting Tank
                                                                        Water Resources Department,
                TUgency responsible for the maintenance (ie.,)          Nellore South Division, Gudur
                    pWS/lrrigation/Agl.Private etc.,
                "TrRailway mileage of crossing of surplus (also railway  Br.No.20 @KM 20/7-9
                   1bridge affected)

                   {Railwaymileageofcrossingofsurplus courseofthetank   Vendodu - Nidigallu
                    ofwatersource (also railway bridge affected)


                 ~8 iDate of Inspection                                 Sri. K.Koteswara Rao,
                  9                                                     Deputy Executive Engineer,
                    Name and Designation of inspection officer           Irrigation Sub nivision. Naidupeta


                 fiolBund
                    bstanda-ds of the Tank Bund as per tne railway
                     affecting tank list
                    |b)Are there T.B.Lstones or other permanent marks to
                    Lerifywhethertop ofbunds as at prescribed level or not


                    Us the top of bund any whether below prescribed
                     lelvels? Ifso, specify charges and shortage in height

                     d)Are there dangerous gullies and cart track ruts etc.,  Tank Bund was partially damaged condition
                     which in your opinion must be repaired urgently? If so
                      cnecified location
                     Lwhether the bund is constructionwith the suitable
                      material and proper slope
                     t)Action taken upto rectifydefects noted in (b) &(c)

                     bprogress of work, if any on hand and the probable
                     Late if completion ofthe work
                  [Tilsurplus Weir                                  ;—
                      L)Length of Surplus Weir as per the Railway affecting
                      tank list
                                          at site are as per the list or not ?
                      Specify the variation if any
                      Opcv>iiy   -
                      tTwhether either the I^-Lhas executed or anything
                      'has expanded to indicate that the Surplus Weir are m  No emergency repairs
                      lleted or made in operative byforming bunds in front

                      |ptc«                                   '
                                           measure completed and action
                       taken