Page 60 - CRS Engineering
P. 60
.QRTHEANNUAI|NSPFaiONTRrWAYrFFrTI».TANKSFORYEARENDINGWITH.
District
Inugunta
Village InuguntaTank
ThomP nftheTank bunded water source
mame ui tn^
^
115
Aumber ofthe Dist. Map ot Railway Affecting Tank
Water Resources Department,
TUgency responsible for the maintenance (ie.,) Nellore South Division, Gudur
pWS/lrrigation/Agl.Private etc.,
"TrRailway mileage of crossing of surplus (also railway Br.No.20 @KM 20/7-9
1bridge affected)
{Railwaymileageofcrossingofsurplus courseofthetank Vendodu - Nidigallu
ofwatersource (also railway bridge affected)
~8 iDate of Inspection Sri. K.Koteswara Rao,
9 Deputy Executive Engineer,
Name and Designation of inspection officer Irrigation Sub nivision. Naidupeta
fiolBund
bstanda-ds of the Tank Bund as per tne railway
affecting tank list
|b)Are there T.B.Lstones or other permanent marks to
Lerifywhethertop ofbunds as at prescribed level or not
Us the top of bund any whether below prescribed
lelvels? Ifso, specify charges and shortage in height
d)Are there dangerous gullies and cart track ruts etc., Tank Bund was partially damaged condition
which in your opinion must be repaired urgently? If so
cnecified location
Lwhether the bund is constructionwith the suitable
material and proper slope
t)Action taken upto rectifydefects noted in (b) &(c)
bprogress of work, if any on hand and the probable
Late if completion ofthe work
[Tilsurplus Weir ;—
L)Length of Surplus Weir as per the Railway affecting
tank list
at site are as per the list or not ?
Specify the variation if any
Opcv>iiy -
tTwhether either the I^-Lhas executed or anything
'has expanded to indicate that the Surplus Weir are m No emergency repairs
lleted or made in operative byforming bunds in front
|ptc« '
measure completed and action
taken