APPENDIX-II
                    PPPPORMA FORTHE ANNUAL INSPECTION OF RAILWAY AFFECTING TANKS FOR YEAR ENDING WITH
                                                                     SPSR Nellore
                     District
                                                                     Palempadu
                     Village
                                                                     Palempadu Tank
                      Mamp of the Tank bunded water source
                      Number ofthe Dist. Map ofRailway Affecting Tank

                      Agency responsible for the maintenance (ie.,)  Water Resources Department,
                      'WS/lrrlgation/ARl.Private etc.,               NelloreSouth Division, Gudur
                      Railway mileage of crossing of surplus (also railway  Br.No.20 (5) KM 20/7-7
                      3ridge affected)
                      Railway mileage of crossing of surplus course of
                                                                     Vendodu - Nidigallu
                      the tank of water source (also railway bridge
                      affected)
                      Date of Inspection
                                                                     Sri. K.Koteswara Rao,
                                                                     Deputy Executive Engineer,
                      Name and Designation ofinspection officer
                                                                     Irrigation Sub Division, Naidupeta

                  10  Bund
                      a)Standards of the Tank Bund as per the Railway
                      affecting tank list
                       j)Are there T.B.Lstones or other permanent marks
                      to verify whether top of bunds as at prescribed
                       evel or not
                      c)As the top of bund any whether below
                      prescribed lelvels? If so, specify charges and
                      shortage in height
                      d)Are there dangerous gullies and cart track ruts
                      etc., which in your opinion must be repaired    Tank Bund was partially damaged condition
                       urgently? If sospecified location
                       e)Whether the bund is constructionwith the
                       suitable materialand proper slope
                       f)Action taken upto rectify defects noted in (b) &(c)

                       g)Progress of work, if any on hand and the
                       probable date ifcompletion ofthe work
                       Surplus Weir
                   11
                       a)Length of Surplus Weir as per the Railway
                       affecting tank list
                       b)Whether the surplus atsite are as per the list or
                       not ? Specify the variation ifany
                       c)Whether either the M.W.Lhas executed or
                       anything has expanded to indicate that the Surplus  No emergency repairs
                       Weir are in deleted or made in operative by
                       forming bunds in front etc.,
                       d)lf so the remedial measure completed and action
                       taken
                       sluice and other masonry works are in sluice and  Sluice No.l was partially damaged tobe
                   12
                       other necessary works in good order as not to   reconstructured
                       pnH.n.erthe safety ofthe^