Page 51 - CRS Engineering
P. 51
APPENDIX-II
PROFORMA FOR THE ANNUAL INSPECTION OF RAILWAY AFFECTING TANKS
FOR THE YEAR ENDING WITH 2020
1. District S.P.S.R NELLORE
2. Village / Panchayat Samithi Periyavaram / Venkatagiri
3. Name of the Tank bounded water source Periyavaram tank
4. Numberofthe Distmap of Railway Affecting tank 108
5. Agency responsible ofthe maintenance (I.e.) PWS
Irrigation/Agl. Private etc., : WR Dept / Venkatagiri.
6. Railway mileage ofcrossing ofsurplus :KM 36/15-16
(Also Railway Bridge No. affected) BrNo: 43
7. Railway mileageofcrossing of surplus course
ofthe tankofwatersource (also railway
Bridge No. affected) : Venkatagiri - Yallakaru
8. Date of Inspection : 12/02/2020
9. Name &Designationof Inspection Officer : Sri G Raghuram Murthy
Deputy Executive Engineer, WR Dept.
10. Bund
a) Standards ofthe tank bundas per the Railway
Affecting tank list
b) Arethere T.B.L stones or other permanent marks
to verify whether top of bunds as at prescribed
level or not
c) As the top of bund any whether below prescribed
level Ifso, specify changes and shortage in height Good Condition
d) Are there dangerous gullies and car track runts etc
which inyour opinion must be repaired urgently?
Ifso specify location
e) whether the bund is constructed with the suitable
Materialsand proper slopes
f) Action taken up to rectify defects noted in (b)to( c)
g) Progress ofwork, ifany on hand and the probable
date of completion of the work
11. Surplus weir
Surplusweir repairs required
a) Length ofsurplusweiras per the Railway Affecting
tank list
b) Whether the surplus at site are as per the list or
Not? Specify the variation ifany
c) Whether either the M.W.L has exceeded or
anything has expanded to indicatethat the surplus
weirare indelete or made in operative by
forming bunds in front etc.
d) Ifso the remedial measures completed and
action taken
12. Sluice and other Masonry works are in Sluices
Good condition
and other necessary works in good order as not to
endanger the safety of the bunds
Surpusweir repairs to be carried out
13. Special remarks ifany by the Inspection officer
14. When was the latest'checked by the Deputy : The resoration works proposed under
Executive Engineer a what action taken of the NABARD Programme
same Taluk Offic^
er
«i;-*.
Ass'stant Div •-!f r><
^.37.tc7- • jineer
/ay ^ 11^ Scc-til,