Page 54 - CRS Engineering
P. 54

appendix-II

                     PREFORMAfortheannualinspection of railwayAFFEaiNGTANKSFORYEARENDINGWITH
                                                                        SPSR Nellore
                    District
                                                                         Ravipadu
                    Village
                                                                         Ravipadu VillageTank
                    Nameof the Tank bunded water source
                    Number of the Dist. Map of Railway Affecting Tank
                            responsible            maintenance           Water Resources Department,
                    Agency                                               Nellore South Division, Gudur
                    PWS/lrrigation/Agl.Private etc..
                    Railway mileage of crossing of surplus (also railway bridge  Br.No.21 @KM 21/23-25
                    affected)
                    Railway mileage of crossing of surplus course of the tank of  Vendodu-Nidigallu
                    water source (also railway bridge affected]
                    Date of Inspection
                                                                         Sri. K.Koteswara Rao,
                                                                         Deputy Executive Engineer,
                    Name and Designation ofinspection officer            Irripatinn Sub Division, Naidupeta



                    aStandards of the Tank Bund as per the Railway affecting
                    tank list
                     b)Are there T.B.L.stones or other permanent marks to verify
                     whether top of bunds as atprescribed level or not
                     c)As the top of bund any whether below prescribed lelvels?
                     if so, specifv charges and shortage in height
                     ^Are there dangerous gullies andTart track ruts etc., which
                     in your opinion must be repaired urgently? If so specified  Tank bund was partially damaged
                     locationlULcmun                             :——
                     iiwhether the bund is constructionwith the suitable

                     material and proper slope
                     f)Artion taken upto rectify defects noted in (b) &(c)  —
                     1
                     progress of work, if any on hand and the probable date if
                     completion of the work
                     Surplus Weir
                  11
                     ^ngth of Surplus Weir as per the Railway affecting tank
                      J]5^ther the surplus at site are as per the list or not?
                      gpprifvthe variation if any
                      c)Whether either the M.W.L.has executed or anything has  Surplus Weir was badly damaged condition
                      expanded to indicate that the Surplus Weir are in deleted or  to be reconstructed
                      made in operative by forming bunds in front etc.,

                      d)lfso the remedial measure completed and action taken

                      Xi^and other masonry works are in sluice and other
                   12                                                      No emergency repairs
                      necessary works in good order as not to endanger the safety
                      ofthe bund                    ^——-—
                                        by the inspecting Officer

                      When was the latest Checked by the Deputy Executive
                      Zineerandwhatactiontaken ofthesametalukofficer



                                                                                 Assistant Divisional Engine
                                           irrigation Sub Division, Naidupeta South Central Railway, Remgunta
   49   50   51   52   53   54   55   56   57   58   59