Page 262 - Mines Facilities Plan
P. 262

Campus   Landscape                                    Public   Street






                                                      Pedestrian  Zone  Typical Internal Campus Walks       Street   Tree Typical Campus Edge Walks





                                                      Landscape   Plantings at   Building  Build-To Line    Pedestrian   Zone






                             Build-To Line






                                                       existing walks to ensure that additions are made that concentrate rather than disperse pedestrian
                                              Mines’ goal to further evolve to be a more pedestrian-oriented campus means more reliance on
                                                 walks and pedestrian malls as conveyors of pedestrians, bicycles, and service and emergency
                                                            efficient manner possible. It is also important that the materials and dimensions of each walk
                                                         flow so that outdoor spaces can be activated, and destinations can be accessed in the most
                                                    vehicles. Socializing outdoor spaces is also a key goal. The master plan carefully analyzed






                                                                                                               enough to accommodate pedestrians, bicycles, and service and emergency vehicles.
                                                                                                             Pedestrian corridor framed by existing and proposed academic buildings is wide







                                                                                                                      





                                           WALKING PATHS AND BIKES











                                                               match intended use.                                    Colorado School of Mines Facilities Master Plan









                                                                                                                      256
   257   258   259   260   261   262   263   264   265   266   267