Page 89 - Mines Facilities Plan
P. 89

83
















                                                                                                                      Existing Conditions


























                                            scorecard that would be used on the Mines campus. Sam Spiegel and
                                      and educational functionality. The assessment team used the National
                                   Each of the classrooms were assessed in terms of their architectural
                                              Chris Cocallas, Campus Architect, edited the scoring matrix with the
                                                  c to  assessment team to develop an evaluation tool that was specifi Mines and its mission. See the opposite page for the classroom analysis  scorecard. Appendix 1 has the scoring sheets for each classroom.  Scores for each classroom were used as a basis for determining the  The assessment team worked with Mines to establish a baseline standard  for each classroom type in terms of technology and educational delivery  systems. Additiona


































                                   3.    Learning Space Rating System as a basis for determining the   improvement costs and the planning priority.  4.  each classroom type based on current cost data from CCIT.
   84   85   86   87   88   89   90   91   92   93   94