Page 33 - ROYAL VIEW BILLING REQUEST
P. 33

PHASE I & II

 Sanitary & Waterline Installation ( 58 out 58 Units COMPLETED )
 rd
 th
 (LGF/UGF 2 /3 & 4 floor) – typical floor
 nd
 CLUSTER  CLUST6R   CLUSTER  CLUSTER   CLUSTER   CLUSTER
 I / 10   2 / 6  3/7  4/9  5A/ 5B  14/15
 UNIT A  UNIT B  UNIT A  UNIT B  UNIT C  UNIT D  UNIT A  UNIT B  UNIT C  UNIT D  UNIT A  UNIT B  UNIT C  UNIT D  UNIT A  UNIT B  UNIT A  UNIT B  UNIT C  UNIT D  INSTALLED  STATUS


 LGF TOILET                                        40/58    COMPLETED




 UGF TOILET                                        40/58    COMPLETED


 2 nd floor
 MASTER BEDROOM                                    40/58    COMPLETED
 TOILET


 2 nd  floor                                       40/58    COMPLETED
 BEDROOM TOILET


 3 floor
 rd
 MASTER BEDROOM                                    40/58    COMPLETED
 TOILET


 d
 3r floor
 BEDROOM TOILET                                    40/58    COMPLETED



 4 floor                                           40/58    COMPLETED
 th
 BEDROOM TOILET
   28   29   30   31   32   33   34   35   36   37   38