■ Based upon the selected scheme, prepare Phase IV – Construction Documents
a perspective rendering of the building
exterior. Based upon the approved Design Development
■ Prepare a code review for applicable documents, we will perform the following tasks:
building and life safety codes.
■ Review necessary structural modification ■ Prepare architectural, structural, MEP,
to existing frame. and interior design documents suitable
■ Review alternatives for MEP systems. for bidding, permitting, and construction
■ Prepare a Basis of Design for MEP systems of the project.
based upon the selected systems. ■ Coordinate the drawings with information
■ Prepare a narrative describing the scope of provided by tenant’s equipment vendors.
the project, which can be used by the CM in ■ Coordinate our services with the CM and
preparing a preliminary cost estimate. the approved construction budget.
■ Attend a maximum of four (4) meetings to ■ Attend a maximum of three (3) meetings
review the progress of the design. to review the progress of our services.
■ Provide signed and sealed drawings for
use in the building permit application
Phase III – Design Development process.
Based upon the approved Schematic Design
documents, we will perform the following tasks: Phase VI – Bidding and Construction
Administration
■ Prepare plans, elevations, and sections to
describe the shell and core. ■ Assist MRA Development Services, Inc. and
■ Select exterior materials and colors. the CM in obtaining competitive bids from
■ Prepare a Finishes Presentation Board subcontractors by responding to Requests
showing interior materials and colors for for Information (RFI) that arise during the
lobbies and toilet rooms. bidding period.
■ Prepare preliminary structural framing ■ Attend construction meetings at the site
modifications plans. at regular intervals. We have included
■ Prepare preliminary MEP plans. a maximum of eight (8) site meetings.
■ Review drawings prepared by MRA Structural and MEP consultants will visit
Development Services, Inc.’s Civil Engineer the site three (3) times each at appropriate
for coordination with the building design, times based upon the progress of the work.
including the utility services to the building. ■ Review shop drawings submittals as
■ Attend a maximum of three (3) meetings to required by the Construction Documents.
review the progress of the design. ■ Respond to contractor RFIs via narrative
■ Provide a Design Development package, and/or graphic means.
including architectural, structural, and ■ Perform final review of contractor’s punch
MEP design. list.
BERNARDON | Response to Request for Proposals | MRA Development Services, Inc.