Page 42 - Bernardon Response to RFP-CRISP Bldg 709
P. 42

www.bernardon.com














                    ■ Based upon the selected scheme, prepare        Phase IV – Construction Documents
                    a perspective rendering of the building
                    exterior.                                        Based upon the approved Design Development
                    ■ Prepare a code review for applicable           documents, we will perform the following tasks:
                    building and life safety codes.
                    ■ Review necessary structural modification            ■ Prepare architectural, structural, MEP,
                    to existing frame.                                    and  interior  design  documents  suitable
                    ■ Review alternatives for MEP systems.                for bidding, permitting, and construction
                    ■ Prepare a Basis of Design for MEP systems           of the project.
                    based upon the selected systems.                      ■ Coordinate the drawings with information
                    ■ Prepare a narrative describing the scope of         provided by tenant’s equipment vendors.
                    the project, which can be used by the CM in           ■ Coordinate our services with the CM and
                    preparing a preliminary cost estimate.                the approved construction budget.
                    ■ Attend a maximum of four (4) meetings to            ■ Attend a maximum of three (3) meetings
                    review the progress of the design.                    to review the progress of our services.
                                                                          ■ Provide signed and sealed drawings for
                                                                          use in the building permit application
                 Phase III – Design Development                           process.


                 Based upon the approved Schematic Design
                 documents, we will perform the following tasks:     Phase VI – Bidding and Construction
                                                                     Administration
                    ■ Prepare plans, elevations, and sections to
                    describe the shell and core.                        ■ Assist MRA Development Services, Inc. and
                    ■ Select exterior materials and colors.             the CM in obtaining competitive bids from
                    ■ Prepare a Finishes Presentation Board             subcontractors by responding to Requests
                    showing interior materials and colors for           for Information (RFI) that arise during the
                    lobbies and toilet rooms.                           bidding period.
                    ■ Prepare preliminary structural framing            ■ Attend construction meetings at the site
                    modifications plans.                                at regular intervals.  We have included
                    ■ Prepare preliminary MEP plans.                    a maximum of eight (8) site meetings.
                    ■ Review  drawings prepared by  MRA                 Structural and MEP consultants will visit
                    Development Services, Inc.’s Civil Engineer         the site three (3) times each at appropriate
                    for coordination with the building design,          times based upon the progress of the work.
                    including the utility services to the building.     ■ Review shop drawings submittals as
                    ■ Attend a maximum of three (3) meetings to         required by the Construction Documents.
                    review the progress of the design.                  ■ Respond  to  contractor  RFIs  via  narrative
                    ■ Provide a Design Development package,             and/or graphic means.
                    including architectural, structural, and            ■ Perform final review of contractor’s punch
                    MEP design.                                         list.




            BERNARDON | Response to Request for Proposals | MRA Development Services, Inc.