                    ■ Visit  the  site  at  substantial  completion   This proposal makes the following Assumptions:
                    and issue the Certificate of Substantial
                    Completion.                                         ■ Existing drawings in all disciplines are
                                                                        available and are accurate.
                 Our proposal is based upon the construction            ■ Demolition drawings will depict areas of
                 period having a duration of no more than nine          demolition with piping to remain being
                 (9) months.                                            capped. Detailed survey of systems to be
                                                                        demolished is not included in our proposed
                                                                        fee.
               Additional Services, Exclusions, Assumptions             ■ Shell space will not be provided with means
                                                                        of heating.  Design of a temporary heating
                 Our services are limited to the scope of services      system is not included in our proposed fee.
                 described above.  If the scope of the project or       ■ A performance specification will be provided
                 our services changes, we reserve the right to          for fire protection and life safety work.
                 invoice  for  Additional  Services.    Examples  of     ■ Design of all mechanical utilities will extend
                 Additional Services would include:                     to five (5) feet outside the building.  Design
                                                                        beyond that point will be provided by others.
                      ■ Making Owner-requested revisions to             We have included time to coordinate with the
                      previously approved drawings.                     Civil Engineer.
                      ■ Making “value engineering” changes to           ■ Design of emergency generator is not
                      the drawings after receipt of bids.               included in our proposed fee.
                      ■ Providing services after a substantial          ■ For design of audio/visual, voice/data,
                      delay in the project schedule.                    security systems, MEP Engineer will work
                                                                        with equipment supplier and provide
                 The following are not included in our scope:           performance specification for bidding and
                                                                        construction. MEP drawings will include
                    ■ Civil engineering, landscape architecture, or     locations for outlet box and  raceways.  We
                    any site improvements.                              have not included in our proposed fee for the
                    ■ Geotechnical engineering.                         services a specialty consultant.
                    ■ Material testing and structural construction      ■ Exterior lighting design is limited to building
                    inspection services.                                specific exterior lighting.  Design of parking
                    ■ Construction cost estimating.                     lot  lighting  system  is  not  included  in  our
                    ■ Audio/visual,  voice/data  systems,  and          proposed fee.
                    equipment.
                    ■ Security.                                    We can begin performing our services upon
                    ■ Interior and exterior signage other than that   receipt of written authorization to proceed.  This
                    required by code.                              proposal is valid for six (6) months.  Our form of
                    ■ Selection and documentation of furniture,    agreement will be based on the AIA B141 Owner-
                    fixtures, and equipment (FF&E).                Architect Agreement, modified to suit this project.
                                                                   Enclosed are our Terms and Conditions which are
                                                                   a part of this proposal.



            BERNARDON | Response to Request for Proposals | MRA Development Services, Inc.
            Chestnut Run Innovation & Science Park | Single Tenant Laboratory & Office Building | July 19, 2021  Page 37
   38   39   40   41   42   43   44   45   46   47   48