Page 57 - Bernardon Response to RFP-Chestnut Run Campus Master Plan
P. 57

GUARDIAN DRUG COMPANY:                   UD | STAR CAMPUS | DE TECH PARK:         W.L. GORE & ASSOCIATES:


     Originally contracted to build a 126,000   Bancroft is proud to have been a trusted   On over six sites throughout Maryland
     SF core & shell addition to their existing   construction partner of the University   and Pennsylvania, Bancroft has managed
     warehouse facility in Dayton, the        of Delaware, the Delaware Technology     multiple major capital improvements
     Warehouse Redevelopment has now          Park, and affiliate institutions         for W.L. Gore & Associates.  Projects
     grown to over 279,000 SF of managed      throughout the past 35 years. The        range from laboratory expansions and
     construction over the last three years.    majority of managed work involves      modernizations, to the construction of
     Projects include lab, office, process, vault,   the construction of science and    manufacturing and production facilities.
     cafeteria, and locker room areas. Our    technology-related program space,        STATS:
     partnership continues to grow at their   including the initial development of
     facility as a result of great relationships   UD’s STAR Campus.                   Location(s) Served:
     with the design team and owner.                                                   Elkton, MD
                                                                                        - Appleton North and East Sites
                                              STATS:                                    - Cherry Hill Site
     STATS:                                   Location(s) Served:                      Elk Mills, MD

     Location(s) Served:                      Newark, DE                               Fair Hill, MD
                                                                                       Avondale, PA
     Dayton, NJ                               Lewes, DE


     Total Value of                           Total Value of                           Total Value of
                                                                                       Construction Managed:
     Construction Managed:                    Construction Managed:                    $ 100 MM+
     $ 35 MM+                                 $ 300 MM+





       SELECTIVE EXPERIENCE:                    SELECTIVE EXPERIENCE:                   SELECTIVE EXPERIENCE:
        •  Warehouse Expansion                   •  Tower at STAR                        •  Lovett Manufacturing Facility
                                                                                         •  Electronic Products Division
        •  Blender Room Renovation and           •  Life Science Research Facility          Consolidation Project
           Fit-Out                               •  Center For Biomedical and            •  Appleton North Autolab
        •  First Floor Manufacturing Suite         Brain Imaging                         •  Appleton East Cleanroom
                                                 •  Health Sciences Complex (STAR           Expansion
        •  Bathroom, Locker Room, and              Campus) Development
           Cafeteria Fit-Out                     •  Drake Hall Organic Chemistry         •  Elk Mills Facility Revitalization
                                                                                            Phase I
        •  Second & Third Floor Fit-Out            Laboratory Modernization              •  Elk Mills Facility Revitalization
                                                 •  DuPont Hall Engineering Lab             Phase II
        •  Process Areas                           Addition
                                                                                         •  Lovett Polution Control
        •  Lab Areas                             •  Canon Marine Laboratory
                                                   Modernization                         •  Lovett Delta Facility
        •  Open Workspaces
                                                 •  DTP@STAR Incubator Labs              •  Lovett I GTO Equipment
                                                                                            Platform
                                                 •  DTP Biomedical Engineering
                                                   Facility                              •  Cherry Hill GLACE Project
                                                 •  DTP Fuel Cell Research Facility      •  Elk Mills EM2 CR6
                                                 •  Speech Pathology Fit-Out             •  Lovett Terminal C
   52   53   54   55   56   57   58   59   60   61   62