RLC SERVICES





                                               Energy Management

                                               Starting with the decision process, RLC can develop the
                                               preliminary documentation and organization strategies including
                                               conceptual design, probable cost studies, and RFP solicitations.
                                               For project managers, we can provide Construction Management
                                               services, Owner Engineer services and third party reviews. RLC
                                               can also support our Clients by supporting, measuring, verifying
                                               project performance and financials even after project completion.

                                               Experience
                                               Atlantic Salmon Facility
                                               RLC developed a 27 MW CHP preliminary design package for a
                                               sustainable farm-raised Atlantic salmon facility, which included
                                               selection of the prime mover, heat recovery and power generation.
                                               Costs for electricity, fuel, and fuel sources were considered
                                               for multi-fuel turbines and reciprocating engines. Absorption
                                               chillers and steam driven chillers were assessed. The client was
                                               furnished with a probable cost, financials and a reliability analysis
                                               to determine the company’s power reliability risk.

                                               Hardwood Lumber Manufacturer
                                               RLC provided a major hardwood lumber manufacturer a design
                                               for underground electrical connection for 150 kW steam engine
                                               and turbine backpressure generators to the local utility. RLC field
                                               crews evaluated the generation control cabinet and developed
                                               record drawings for the utility and electrical inspector so
                                               interconnection could be completed. Tasks included sizing battery
                                               and evaluating electrical loads in the adjoining steam boiler plant.

                                               Aquaculture Facility
                                               RLC provided a preliminary design and probable cost for a
                                               complete 14.4 MW reciprocating multi-engine diesel fuel peaking
                                               plant with absorption chillers for a land based aquaculture facility.
                                               The client was also provided with an alternate model of a CHP
                                               Dual Fuel reciprocating engine plant with absorption chillers using
                                               primarily natural gas. To source the natural gas, RLC developed an
                                               analysis and probable cost for a new natural gas distribution
                                               pipeline for the project and the adjacent city.

                                               Additional Projects
                                               RLC has provided piping stress analysis for new and refitted power
                                               plant steam turbine steam blow piping for multiple clients within
                                               the US. Our engineering services have included pipe line schedule
                                               selection, support design and placement of temporary supports.