Page 68 - The TM Submarine Cable Book
P. 68

5: Connections around the world




                                                                         TECHNOLOGY
                                                                         High end Dense Wavelength Division
                                                                         Multiplexing (DWDM).




                                                                         SYSTEM COMMISSIONING AND UPGRADE
                                                                         In service starting June 2017.
                                                                         Estimated end of service in 2042.

























                           OWNERSHIP
                           TELEKOM MALAYSIA and
                           MALAYSIAN COMMUNICATIONS &
                           MULTIMEDIA COMMISSION.
                                                                            1.  S1 Mersing, Johor (Malaysia).
                                                                            2.  S2 Kuching, Sarawak (Malaysia).
                                                                            3.  S3 Bintulu, Sarawak (Malaysia).
                           CABLE LENGTH                                     4.  S4 Miri, Sarawak (Malaysia).
                           The system has a length of 3,824 KM,             5.  S5a Kota Kinabalu, Sabah (Malaysia).
                           with 9 Branching Unit (BU) and 26                6.  S5b Cherating, Pahang (Malaysia).
                           repeaters.



                           SYSTEM CAPACITY
                           This cable consists of 3 fibre pairs with
                           design capacity can be upgraded until
                           12.8Tbps.












                                                                    67
   63   64   65   66   67   68   69   70   71   72   73