38 Records of Bahrain
-12-
(o) Production.
A total of 11,016,711 not barrels of crude oil was
produced from the Bahrain Field during 10601 this Is an
avorage production rate of 20,180 not barrels per day.
(d) IwDortB of Arabian Aiggrloan Crude.
A total of 46,201,911 net barrel! of tiaudl Arabian
Crude Oil w«s received in Bahrain during 1960, all though tha
Arabian'- Bahrain submarine pipeline.
(e) V-TPlorotlon of Additional Area.
The geophysical survey of the water covered portions of
the Additional Area by the ruflootlon seismograph Method started
In 1949 was contlnuud Into 1960, and was completed by April.
The Interpretation of tha data collected la still occupying
the full time attention of the Company1s geophysicist.
(f) Hefjnorv Onnrntlona.
Crude runs to the Refinery for the year 1960 totalled
66,906,712 barrels. Product shipments were as follows*-
liurral.a
Aylatlon Gasoline 163,987
wasollna 16,149,666
Kerosono 6,304,083
Jet Fuel 06,963
Diesel Oil 9,713,621
Fuel Oil 19,603,648
Synthetic Crude 1,641,366
Asphalt 414,406
Miscellaneous 698
62.068.217
The aviation gasoline above was Imported from Abadan and the
United .States. Tiio Item "Miscellaneous11 Includes products
such as butane, asphalt paint, pipe prli&ui*. knroaone extract,
etc. Crude running was approximately 1,8> higher than in 1949.
(g) Refinery Construction.
Major new operating facilities completed end placed In
commission during the year included Research and Development Depart
ment Barrel Storage building, Addition of o sixth 2oo-Korb Treater
at the tfater Treating Plant, concrete atorngo and loading plat
form at the Aaphalt Plaat, and new high lift pump and pump house.
(h) flltrsft.
The following represents construction arid alterations
completed on Bltrah island and ut the Marino Terminal during
1960i-
Wew Fuel Oil Pump house
New 18" and 20" sealines to No.9 Marf
Uarlna railway wee completed
Air conditioning installed on tugs "Karsakhan" end
"Muharraq"
Four new OU "quads", one QU "twin" and three no* pumps
were Installed at the old pump house.
011-woterseparntor
Completion of additional navigational aids.
/ (i)