Page 387 - VillageOrdinanceBook
P. 387
Chapter 14 – Building Code
HVAC Permit Fees $72.60 per unit, up to & including
31. Heating – Incinerators – Wood burning appliances 150,000 input BTU units
$31.90 ea additional 50,000 BTUs
Additional fee of or fraction thereof, $1,540 (max/unit)
$121.00 per unit
32. Commercial/Industrial Exhaust Hoods $121.00 per unit
33. Exhaust Systems
$3.14 per 100 sq ft of conditioned area
34. Heating & Air Conditioning Distribution System $72.60 minimum fee
$72.60 per unit, up to 3 tons or ]
35. Air Conditioning 12,000 BTUs or fraction thereof
$31.90/each additional ton or
Additional fee of 12,000 BT BTUs or fraction
thereof $1,540 Max/unit)
14.87 ELECTRICAL PERMIT FEES.
36. Unit Charge New Residential Construction only (plus ampere charges listed below)
1-bedroom $72.60
2-bedroom $79.20
3-bedroom $86.800
4-bedroom $121.00
Residential 0 – 100 amp $72.60 + $1.94 per circuit
New, Add, Alters 101 – 200 amp $79.20 + $1.94 per circuit
Ampere charge 201 – 400 amp $91.30 + $1.94 per circuit
401 – 600 amp $110.00 + $1.94 per circuit
601 – 800 amp $145.20 + $1.94 per circuit
Commercial/Industrial/Agricultural Work (New Construction, alternations, or additions)
$50 – $500 of electrical cost $3.63 per each $100 of work
$48.40 for 1st $500 of work,
$500 – $10,000 cost of
electrical work plus $3.03 for each additional
$100 of work
Over $10,000 electrical cost $302.50 for the 1st $500 of
Minimum Electrical Permit Fee work, plus $1.82 for each
Re-Inspection Fee additional $100 of work
$72.60
$151.80
55