Page 16 - 2017 Hotel Cost Estimating Guide
P. 16
ECONOMY
Prototype Hotel: 90 guestrooms, 3 stories, 30 rooms/loor
Other assumptions and allowances are listed in each section below.
Lobby - Add for a Full Renovation
RANGE AVERAGE
Additional Demolition $815.35 to $1,027.34 $914.82
Decorative Lighting $1,806.22 to $2,773.43 $2,285.29
Electrical $856.12 to $1,284.18 $1,080.85
Hard Surface Flooring $407.68 to $570.75 $497.80
HVAC $392.71
to $513.67 $431.12
to $674.19 $577.95
Life Safety
$532.97
to $2,247.31 $1,765.06 Architectural Lighting
$1,528.78
to $12,128.34 $11,054.79 Front Desk (New Pods, in Existing Location) $10,191.88
to $4,042.78 $3,684.93 Front Desk Equipment
$3,397.29
to $853.20 $765.80 Acoustical Ceiling Tile and Grid (New) $707.89
to $3,073.15
$2,682.17
Drywall Partitions
$2,268.00
Lobby Full Renovation Additional Cost Subtotal $22,904.89 to $29,188.34 $25,740.58
Lobby Full Renovation Additional Cost Per SF $127.25 to $162.16 $143.00
Public Restrooms Softgoods Renovation
Assume one, 80 SF unisex restroom. Ceiling 8' AFF.
RANGE AVERAGE
Demolition
$47.56 to $71.34 $54.70
Artwork and Artifacts (Installed) $99.49 to $167.00 $133.52
Framed Mirrors
$26.08 to $38.15 $31.73
Paint Drywall Ceiling
$43.20 to $60.00 $51.84
Paint Doors and Trim $68.25 to
$82.68 $75.79
Decorative Vanity Lighting
$168.50 to
$250.00
$208.62
Public Restrooms Softgoods Renovation Subtotal $453.07 to $669.17 $556.20
Public Restrooms Softgoods Renovation Cost Per SF $5.66 to $8.36 $6.95
Public Restrooms - Add for a Full Renovation
RANGE AVERAGE
Additional Demolition
$724.76 to $951.24 $833.47
Toilet Accessories
$254.80 to $408.59 $343.92
Replace Doors
$652.50 to $812.50
$740.83
Toilets / Urinals
$905.95 to $1,117.71 $1,014.80
Architectural Lighting
$760.99 to $951.24 $825.68
Tile Flooring
$905.95 to $1,156.80 $1,070.03
Motion-sensing Flush Valves $642.00 to $800.00 $748.80
Motion-sensing Faucets
$760.00 to
$900.00
$859.68
Public Restrooms Full Renovation Additional Cost Subtotal $5,606.94 to $7,098.08 $6,437.19
Public Restrooms Full Renovation Additional Cost Per SF $70.09 to $88.73 $80.46
16
JN+A and HVS DESIGN | HOTEL COST ESTIMATING GUIDE 2017