Page 18 - 2017 Hotel Cost Estimating Guide
P. 18

ECONOMY





Prototype Hotel: 90 guestrooms, 3 stories, 30 rooms/loor 
Other assumptions and allowances are listed in each section below.





Outdoor Parking

Assume 100 parking spaces, 9' x 19', and 25'-wide aisles.
RANGE AVERAGE

Clean and Seal Asphalt $5,625.00
to $9,720.00 $7,010.55
Stripe Spaces $1,750.00 to $3,400.00 $2,302.60 

Pavement Resurfacing
$29,565.00
to $69,255.00
$51,794.10


Outdoor Parking Subtotal $36,940.00 to $82,375.00 $61,107.25 
Outdoor Parking Renovation Cost Per Space $369.40 to $823.75 $611.07


Structured Parking

Typically, hotels in this market segment do not have structured parking.

Landscaping

RANGE AVERAGE
Landscaping Allowance $11,324.31 to $19,024.85 $15,242.53


Landscaping Renovation Cost $11,324.31 to $19,024.85 $15,242.53


Common Additives

RANGE AVERAGE
New Electronic Key System $218.00 to $314.74 $270.05 

Elevator Cab Finishes $6,794.59
to $9,512.42
$8,130.86
Elevator Modernization
Hydraulic, per Cab
$40,767.53 to $49,226.79 $44,599.68 

PTAC Unit Direct Replacement, NIC finishes
$770.00
to $1,300.00
$1,029.83
Laundry Equipment (Direct Equipment Replacement with Access)

75# Washer $22,648.63
to $30,915.38 $26,680.08
125# Dryer $33,972.94 to $42,805.90 $38,117.64 

Ironer / Folder
$113,243.13
to $128,417.71
$119,448.86
Guestroom ADA Modifications

Bathtub Room
$14,580.00 to $19,800.00 $17,939.80 
Roll-in Shower Room
$19,800.00 to $29,000.00 $24,923.59 

Exterior Signage - Monument - New Graphics on Existing Sign
$5,662.16 to $8,323.37 $6,987.10 
Exterior Signage - Highway - New Graphics on Existing Sign
$22,648.63 to $30,915.38 $26,680.08 

Exterior Signage - New Exterior Brand Sign in Existing Location
$22,648.63 to $27,348.22 $24,777.60 
Dumpster Enclosure (CMU Walls, Wood Gate, Bollards, Concrete Pad) $15,000.00 to $17,600.00 $16,416.43 

Power-operated, Bi-parting Entrance Doors (Inner and Outer at a Vestibule) $25,600.00 to $33,826.00 $30,372.80 
Replace Guestroom Entry Door and Hardware
$599.50 to $1,030.05 $797.91 
Replace Guestroom Connecting Doors and Hardware
$1,199.00 to $1,853.00 $1,474.77 

Replace Corridor Service Doors and Hardware
$749.38
to $1,287.56
$1,061.39























18
JN+A and HVS DESIGN | HOTEL COST ESTIMATING GUIDE 2017

   16   17   18   19   20