EXTENDED STAY 





Prototype Hotel: 150 guestrooms, 4 stories, 38 rooms/loor
Other assumptions and allowances are listed in each section below. 





Restaurant - Add for a Full Renovation

RANGE AVERAGE
Additional Demolition $4,756.21 to $6,658.70 $5,691.60 

Banquettes $14,715.00
to $24,721.20 $19,788.84 
to $17,167.50 $13,461.50
Buffet Equipment
$9,265.00 

to $8,225.62 $6,606.54 Decorative Lighting
$4,989.73 
to $15,398.24 $12,164.01 Architectural Lighting
$9,116.07

to $16,646.74 $14,449.37
Electrical $13,317.39 
to $4,914.00 $4,284.56 Hard Surface Flooring (20% of Floor Area ) $3,780.00 

to $6,658.70 $5,043.96 HVAC $3,329.35
to $8,739.54 $7,693.17
Life Safety
$6,737.97 
to $18,930.00 $16,688.66 Millwork Buffet, Host Station (New, in Existing Location)
$14,863.16 

to $2,140.30 $1,905.88 Sound System
$1,698.65
to $9,690.00 $8,360.00 Tables $7,030.00 

to $10,503.00 $8,241.39 Drywall Partitions $6,300.00 
to $2,322.27
$2,128.83
TV and Mount (55", incl. Programming Allowance) $1,939.73


Restaurant Full Renovation Additional Cost Subtotal $101,838.26 to $152,715.79 $126,508.33 

Restaurant Full Renovation Additional Cost Per SF $72.74 to $109.08 $90.36 
Restaurant Full Renovation Additional Cost Per Seat
$1,339.98
to $2,009.42
$1,664.58


Bar / Lounge

Typically, hotels in this market segment do not have bar/lounge areas.


Kitchen
Assume a kitchen area of approximately 80 SF.

RANGE AVERAGE
Selective Demolition
$475.62 to $665.87 $537.45 
Vinyl-coated Tile Ceiling (2' x 4' Tiles and New Grid) $385.00 to $680.00 $549.80 

Fluorescent Lighting (2' x 4')
$285.37 to $475.62 $345.30 
Paint Door Frames and Trim
$136.50 to $165.35
$151.57

Paint Walls
$31.10 to $43.20 $37.32 
Quarry Tile Flooring
$1,132.43 to $1,447.56 $1,276.47 

Replace Doors
$1,472.16 to $3,324.50
$2,555.09 
Kydex-paneled Walls
$358.27 to $691.20
$520.65


Kitchen Renovation Subtotal $4,276.46 to $7,493.30 $5,973.66 

Kitchen Renovation Cost Per SF $53.46 to $93.67 $74.67

Kitchen Equipment

RANGE AVERAGE
Select Kitchen Equipment $1,811.89 to $2,359.08 $2,073.53


Kitchen Equipment Subtotal $1,811.89 to $2,359.08 $2,073.53

Kitchen Equipment Cost Per SF $22.65 to $29.49 $25.92