Page 26 - 2017 Hotel Cost Estimating Guide
P. 26

EXTENDED STAY





Prototype Hotel: 150 guestrooms, 4 stories, 38 rooms/loor 
Other assumptions and allowances are listed in each section below.





Ballroom and Prefunction

Typically, hotels in this market segment do not have ballrooms.


Meeting Rooms Softgoods Renovation
Assume a meeting room area of approximately 24' x 23' (552 SF). Ceiling 12' AFF.

RANGE AVERAGE
Demolition of Vinyl and Carpet $625.10 to $918.90 $771.38 

Carpet and Pad
$2,028.63 to $2,415.05 $2,206.17 
Paint Articulated Drywall Ceiling $288.81 to $402.96 $344.75 

Paint Doors and Trim
$300.00 to $360.00 $326.49 
Millwork Running Trim (Refinish - Stained Hardwood Crown, Chair, and Base) $271.44 to $399.18 $344.78 
Protect / Remove / Reinstall All Light Fixtures
$436.00 to $686.70 $567.89 

Vinyl Wallcovering (LY 54")
$1,417.22 to $1,873.34 $1,645.70 
Window Treatments (with Hardware and Installation)
$2,180.00 to $3,640.00
$2,910.00


Meeting Rooms Softgoods Renovation Subtotal $7,547.21 to $10,696.13 $9,117.15 

Meeting Rooms Softgoods Renovation Cost Per SF $13.67 to $19.38 $16.52


Meeting Rooms - Add for a Full Renovation
RANGE AVERAGE

Additional Demolition
$3,125.51 to $3,806.87 $3,436.81 
Banquet Chairs
$6,702.86 to $9,462.86 $8,017.14 

Artwork, Accessories, and Mirrors (Installed)
$985.00 to $1,637.00 $1,311.49 
Acoustical Tile Ceiling (New)
$2,170.86 to $2,616.48 $2,348.45 

Decorative Lighting
$982.50 to $1,637.80 $1,318.29 
Electrical
$5,250.86 to $6,563.57 $5,697.18 
HVAC
$1,312.71 to $2,625.43 $1,988.76 

Life Safety
$2,656.68 to $3,445.88 $3,033.31 
Architectural Lighting
$3,938.14 to $5,250.86 $4,640.45 

Millwork Running Trim (Stained Hardwood Crown, Chair, and Base) $2,303.00 to $2,874.11 $2,702.42 
Millwork Serving Stations
$3,052.00
to $5,231.83
$4,558.06


AV Infrastructure: Ceiling speakers and wiring to AV room, CAT 6 cable to light bars, $566.22
to $1,189.05
$888.96
120V power. Equipment by others. HSIA. Projection screens built into ceiling.


Meeting Rooms Full Renovation Additional Cost Subtotal $33,046.34 to $46,341.74 $39,941.31 

Meeting Rooms Full Renovation Additional Cost Per SF $59.87 to $83.95 $72.36


Board Room
Typically, hotels in this market do not have a Board Room.

























26
JN+A and HVS DESIGN | HOTEL COST ESTIMATING GUIDE 2017

   24   25   26   27   28