Page 35 - Updated SuDS Design & Evaluation Guide-Newham V3 Spreads
P. 35

Holyoakes School
                                                                      Modified Flow Routes
                                                                     key
       Step 2 – Modified Flow Route analysis
 Concept Design  Step 1 – Existing Flow Route analysis  Holyoakes School  The modified flow route analysis is the basis   Once the modified flow routes have   Concept Design
                                                                            Proposed hard surfaces
 Existing Flow Routes
                                                                            Proposed soft surfaces

                                                                            Proposed trees
                                                             demonstrated that runoff can flow
      for low flow conveyance through the site,
 key
                                                             predictably through the site, the arrangement
      overflow arrangements and exceedance
 Existing Contour
 Existing contours
                                                                            Proposed contours
      routes when design criteria are exceeded.
                                                             of runoff collection, source control, site
 Existing Flow Route
 Existing surface  ow
                                                             control, regional control, conveyance, storage
                                                                            Surface  ow
                                                             and final release from site can be designed.
                                                                            Roof runo
 Holyoakes School
                                                                                Modified Flow Route
                                                                            Modi ed  ow routes                Holyoakes School
  Existing Flow Routes
                                                                                                               Modified Flow Routes
 key
        Existing contours                                                                                     key
                                                                                                                     Proposed hard surfaces
        Existing surface  ow
                                                                                                                     Proposed soft surfaces

                                                                                                                     Proposed trees

                                                                                                                     Proposed contours

                                                                                                                     Surface  ow
 29                                                                                                                30
                                                                                                                     Roof runo

                                                                                                                     Modi ed  ow routes








 Existing landscape
 features









 Habitat
 considerations                                                Proposed

 Historical drainage                                        discharge to
                                                           existing ditch


 Flow Route Analysis for Holyoakes School, Robert Bray Associates.  Modified Flow Route Analysis for Holyoakes School, Robert Bray Associates.


 Newham Council SuDS D & E Guide                                                                        © 2020 McCloy Consulting & Robert Bray Associates  Newham Council SuDS D & E Guide                                                                        © 2020 McCloy Consulting & Robert Bray Associates
   30   31   32   33   34   35   36   37   38   39   40