Page 54 - Updated SuDS Design & Evaluation Guide-Newham V3 Spreads
P. 54

Concept Design  7.5   Concept information required for SuDS evaluation                                                 7.5.2  Preliminary water quantity considerations                                                             Concept Design

           The information required at the Concept Design stage will depend on the type
                                                                                                                             At the Concept Design stage it is necessary
                                                                                                                             to show how runoff is collected and how it is
           and scope of the proposed development.
                                                                                                                             stored within the development:
           7.5.1   Pre-application discussion
                                                                 Constructive discussion between the LPA,
                                                                                                                                                                                       ■
                                                                                                                                ■
                                                                                                                                                                                       Approximate storage volumes should be
                                                                                                                                 The designer will confirm whether
                                                                 the LLFA, Thames Water and the SuDS
                                                                                                                                                                                       provided for each location where flows
                                                                                                                                 Approach 1 or Approach 2 is being used,
           The design team will provide a Concept
                                                                 designer will save the developer time and the
                                                                                                                                                                                       are attenuated.
           Design for a pre-application design meeting,
                                                                 cost of potential re-design, providing
                                                                                                                                 managed.
           or as preliminary design information should a
                                                                 planners with reassurance that the project
           pre-application meeting not be appropriate.
                                                                                                                                                                                       sub-catchments and along the
                                                                                                                                 A reduction in the volume of rainfall
                                                                 that is delivered will meet local planning                     ■  and confirm how volumes are being                   ■  Storage will be demonstrated within
           Pre-application discussions with the LPA and          expectations.                                                   discharged from the site will be                      management train, with the location of
           LLFA provide an opportunity for the designer                                                                          demonstrated by ‘interception losses’ and             flow controls confirmed.
           to confirm the preliminary requirements for                                                                           long-term storage, where this is
           the SuDS design, and for the evaluation team                                                                          appropriate (Approach 1).
           to understand the objectives and character            The discussions will be informed by the ASA
           of the SuDS proposed for the development.             (Association of SuDS Authorities) NSTS for
                                                                 Sustainable Drainage: Practice Guidance.
                                                                                                                                                                          Design Note:
                                                                                                                                  Ideally runoff should be stored in shallow landscape features. Where this is not possible,
                                                                  http://www.susdrain.org/files/                                                         deeper tank or pipe storage must be justified.

                                                                  resources/other-guidance/lasoo_non_
  49                                                              statutory_suds_technical_standards_                                                                                                                                     50
                                                                  guidance_2016_.pdf                                                                                          Two shallow raingardens provide storage at Measham
           A sunken SuDS courtyard with solar water feature                                                                                                                     Leisure Centre.  Robust ground cover should persist
           into a formal rill at Bromsgrove Civic Centre.         (ASA were formally known as LASOO)                                                                                        through winter in order to protect soils.


































           Newham Council SuDS D & E Guide                                                                        © 2020 McCloy Consulting & Robert Bray Associates  Newham Council SuDS D & E Guide                                                                        © 2020 McCloy Consulting & Robert Bray Associates
   49   50   51   52   53   54   55   56   57   58   59