Page 50 - Updated SuDS Design & Evaluation Guide-Newham V3 Spreads
P. 50

Concept Design  7.4.13  Flow rate calculations              Approach 2 is simpler but usually results in                               approach 1                                      approach 2                                   Concept Design

           The aim of controlling flow from a
           development, whether it has been previously
                                                                  larger storage volumes than Approach 1.
           developed or not, is to restrict outflow rates
                                                                                                                                                                                                   inflow
                                                                                                                                                  inflow
                                                                  An allowance for climate change, and in
           to pre-existing ‘greenfield runoff rates’.
                                                                  certain situations urban creep, should be
                                                                                                                                                   rainfall
                                                                                                                                                                                                    rainfall
                                                                  included in hydraulic calculations.
           There are two approaches to controlling
                                                                                                                                                                                                        x
                                                                                                                                                        x
           outflow rates: Approach 1, as set out in the
                                                                  An online tool for estimating Greenfield
           NSTS (non-statutory technical standards)
                                                                  runoff rates can be found at www.uksuds.
           requiring additional volume management,
                                                                  com or calculated using the methodology in                                         area                                             area
           and Approach 2, the current practice                   the SuDS Manual 2015. The uksuds.com
           commonly called the Qbar method.
                                                                  calculator is  based on regional geological
           Approach 1 – (NSTS S2 and S4), where the               mapping which can be unrepresentative of                               interception losses                              interception losses
           volume of runoff is managed to Greenfield              actual site conditions.  Inputs to the
           volume, the allowable discharge rate is                Greenfield runoff calculation should rely upon
           permitted to vary between the  1 in 1 year and         actual soil types for the site rather than                                                    other
           1 in 100 year Greenfield runoff rates for the          regional geological maps.                                              attenuation             long                          attenuation
           respective rainfall return periods.
                                                                  In Approach 1 the ‘greenfield runoff rate’ will                           storage             term                              storage
           Approach 2 – (NSTS S6), where additional               increase with increasing storm return periods.                                               losses
           runoff volumes cannot be managed on site,              The flow control mechanism will need to                               variable outflow                                                    outflow for 1in100 yr
                                                                                                                                                                      2L
           runoff rates must be further restricted to             account for this increase in flow rate.                              from 1in1 to 1in100yr         /sec                                   rainfall event limited
  45       ensure that there is no increase in flood risk                                                                               greenfield runoff            /ha                                     to 2yr greenfield            46
                                                                                                                                                                                                                runoff rate
                                                                                                                                            rates
           elsewhere. The general approach that is                In Approach 2 the Qbar value for a site will
                                                                  only be achieved for the site or sub-
           adopted is to limit the maximum outflow rate
                                                                  catchment when the storage feature is full.
           to Qbar (approximately equivalent to 1 in 2            Most of the time the flow rate is less until a
           year greenfield rate) for all rainfall return
                                                                  full storage head is generated.
           periods up to the 1 in 100 year rainfall event                                                                                  Approach 1 and Approach 2 - Discharge Requirements
           depending on the local soil type.


                                                                                                                                                            1 in 1 year rainfall   1 in 100 year   Long term
                                                                                                                                                               (maximum             rainfall        storage-
                                                                                                                                                              outflow rate)       (maximum           volume
                                                                                                                                                                                outflow rate)        control
                                                                                                                                            Approach 1          1 in 1 year      1 in 100 year         Yes

                                                                                                                                                             greenfield rate      greenfield
                                                                                                                                                                                     rate
                                                                    See Climate Change Allowance (CCA)
                                                                                                                                            Approach 2        Qbar/ Qmed         Qbar/ Qmed            No
                                                                    Section 9.5.4.6
                                                                    and Urban Creep Section 9.5.4.7




           Newham Council SuDS D & E Guide                                                                        © 2020 McCloy Consulting & Robert Bray Associates  Newham Council SuDS D & E Guide                                                                        © 2020 McCloy Consulting & Robert Bray Associates
   45   46   47   48   49   50   51   52   53   54   55