Page 69 - Bexley SuDS DESIGN & EVALUATION
P. 69

8.8  Outline information required for SuDS evaluation


      8.8.1

      The information required at Outline Design             The Outline SuDS Design will show what the
      stage will depend on whether a Concept                 scheme will look like, how it will function and       Outline Design
      Design has been provided and the level of              confirm any additional information provided
      information included at that stage.                    since Concept Design Stage.

      The design information should be provided in
      plan form, confirming site layout and SuDS
      infrastructure together with a SuDS Design
      Statement presenting all information that
      cannot be conveyed on plan.



      8.8.2  Outline Design – information checklist


      Information recommended in the LASOO (Local
      Authority SuDS Officer Organisation) Practical Guidance



         ■  Flood Risk Assessment (FRA) – a review              ■  ground investigation review
          of critical elements
                                                                ■  evidence of third party agreement for
         ■  Outline Design Strategy Statement                   consent to discharge or agreement in               64
                                                                principle.
         ■  Outline Design Plan – layout

         ■  the plan will incorporate preliminary
          landscape proposals



      Additional information to inform evaluation of the scheme:



         ■  topographical information and flow route            ■  sensitive receptors for runoff where
          analysis                                              appropriate e.g. SSSIs

         ■  destination and discharge route of rainfall         ■  offsite works that may be required
          via infiltration or runoff
                                                                ■  general maintenance principles
         ■  infiltration investigation results where            ■
          appropriate                                           design life of any products used and
                                                                requirements for potential replacement.
         ■  existing utilities plan confirming existing
          watercourses or sewer locations




      London Borough of Bexley SuDS D & E Guide                                                        © 2018 McCloy Consulting & Robert Bray Associates
   64   65   66   67   68   69   70   71   72   73   74