Page 72 - Bexley SuDS DESIGN & EVALUATION
P. 72
Design and Evaluation Stage 3 –
Detailed Design 9.0
Detailed Design
The SuDS strategy will be reasonably fixed by Detailed Design stage. The
management train, selection of SuDS features and general means of storing
runoff will have been evaluated and defined at earlier design stages.
The development and refinement of Concept and Outline designs at Detailed
Design stage will demonstrate that the project objectives can be delivered
upon and will be presented with either the detailed planning application or
to discharge planning conditions, or reverved matters, depending upon the
requirements of the LPA.
Competent design details ensure that runoff
is collected, conveyed, cleaned, stored,
controlled and discharged from site in an
effective manner that provides wider
benefits.
Failure of individual elements of the design
can:
67 ■ invalidate expected storage volumes and
flow rates
■ prevent adequate treatment
■ negatively impact or miss opportunities to
contribute to amenity use
■ create hazards to wildlife or miss
opportunities to support biodiversity
■ cause local ponding, flooding and
inconvenience to the public
■ increase maintenance difficulty and cost.
Grey to Green project, Sheffield City Council.
Groundbreaking project integrating SuDS into
the heart of Sheffield, replacing redundant
roadway with exciting planting, to a sequence
of landscape cells leading to the River Don.
London Borough of Bexley SuDS D & E Guide © 2018 McCloy Consulting & Robert Bray Associates