Page 75 - Bexley SuDS DESIGN & EVALUATION
P. 75

9.3.2  Drawing package

      The SuDS drawing package should include
      the following:


       Design           Topographical survey of the site                                                           Detailed Design
       information
                        Coordinated constraints map identifying all potential design constraints including
       drawings
                        areas of flood risk (fluvial, pluvial and ground water), contaminated land,
                        archaeological significance, poor ground conditions, unexploded ordnance (UXO),
                        presence of invasive species, protected habitats, tree Protection Orders (TPO) and
                        root protection zones (RPZ). [note : list is not exhaustive]

                        Existing utility services drawing. Details of existing site surface water drainage
                        infrastructure and ownership established

                        Plan of site detailing flow routes including exceedance flow routes, subcatchment
                        boundaries, flow control locations, storage locations, contributing impermeable area,
                        and phasing where appropriate;

                        Drawing of site drainage catchment areas showing permeable and impermeable areas
                        within defined subcatcatchments.



       Design           Detailed site layout at an identified scale (1:200 or 1:500 or as appropriate or any other
       drawings         scale agreed) including a North direction arrow.

                        Long sections and cross sections for the proposed drainage system, including               70
                        surrounding site level and proposed finished floor levels (where appropriate)

                        Construction Details – inlets, outlets, flow controls, storage, edge details, connection
                        details to receiving watercourse / sewers / public surface water sewers / highway
                        drains;

                        Planting arrangement and surface treatment / materials drawings where detailed not
                        included on other drawings.

                        Critical design levels should be identified on all relevant drawings.










      Facing:
      Rectory Gardens Rainpark, Hornsey.
      A small public park that collects polluted road
      runoff through silt forebays and underdrained
      infiltration basins that discharge clean water
      slowly to the River Moselle.


      London Borough of Bexley SuDS D & E Guide                                                        © 2018 McCloy Consulting & Robert Bray Associates
   70   71   72   73   74   75   76   77   78   79   80