Page 64 - Newham SuDS DESIGN & EVALUATION GUIDE
P. 64

8.3.1  Information to support Outline Design
      Outline Design  Limited information may be available at                                                                8.4  Design criteria considerations                       ■  storage locations and approximate               Outline Design

                                                                                                                             Quantity
           Concept Design Stage and must be
                                                                                                                             The designer should confirm
           augmented to provide a full understanding of
           the site at Outline Design.
                                                                                                                                 ■
                                                                                                                                 whether infiltration is appropriate for the
           The following information should be collated
                                                                                                                                                                                       volumes to appropriate flow rates
                                                                                                                                 site or whether rainfall will be managed as
           to evaluate site constraints and inform SuDS
           design:
                                                                                                                                 ■  runoff                                             ■  overflow arrangements from each storage
                                                                                                                                                                                       location
                                                                                                                                 whether Approach 1 or Approach 2 is
              ■  Existing services, including location and           ■  Consents affecting off-site and on-site                  being used to manage volumes
               depth. These can influence layout, depth              elements of the SuDS.                                                                                             ■  exceedance routing when design volumes
               and placement of SuDS features.                                                                                   ■  contributing area of impermeable hard              are exceeded or flows are generated from
                                                                     ■  Confirmation of the method of discharge:                 surface                                               outside the site
              ■  Planning conditions, for example SuDS in            infiltration or runoff to a watercourse or
               ‘conservation areas’, which may influence             sewer and impact of runoff volumes on                       ■  sub-catchment design                               ■  allowances for climate change and urban
                                                                                                                                                                                       creep.
               choice of SuDS components and the use                 the site.                                                   ■  flow control locations
               of materials.
                                                                  Confirmation of ownership and maintenance
              ■  Ownership and future management of               arrangements would be subject to a planning

               SuDS will influence component selection,           condition.                                                 Quality
               typically adoption by Local Authorities
                                                                                                                             The designer should demonstrate
               and especially Highways Departments.
  59                                                                                                                             ■  there are sufficient SuDS surfaces to meet         ■  how spillage could be managed                   60
                                                                                                                                 interception losses requirements
                                                                      A biodiversity raingarden at Renfrew Close,                                                                      ■  how runoff could be managed during
                                                                        Newham with cornfield annuals alongside                  ■  sufficient treatment is available to manage        construction.
                                                                                      meadow flora for the future.
                                                                                                                                 pollution risk along the management train






                                                                                                                             Amenity


                                                                                                                             The designer should demonstrate

                                                                                                                                 ■  the SuDS is understandable to people               ■  the visual character of the SuDS will

                                                                                                                                 using the site and maintenance personnel              enhance the development
                                                                                                                                 – legibility
                                                                                                                                                                                       ■  spaces and connecting routes are multi-
                                                                                                                                 ■  the site is generally accessible to people         functional and can be used when not
                                                                                                                                 and safe ‘by design’                                  providing a SuDS function for rainfall
                                                                                                                                                                                       management.





           London Borough of Newham SuDS D & E Guide                                                     © 2018 McCloy Consulting & Robert Bray Associates  London Borough of Newham SuDS D & E Guide                                                     © 2018 McCloy Consulting & Robert Bray Associates
   59   60   61   62   63   64   65   66   67   68   69