Outline Design  8.6  Affordability  more expensive but avoids extensive pipe   8.8  Outline information required for SuDS evaluation  Outline Design

 The design of SuDS is influenced by the type
      8.8.1
 of development and how important each
 work, gullies, manhole, dedicated SuDS
      The information required at Outline Design
                                                             The Outline SuDS Design will show what the
 component is to the appearance and
 storage and in some situations oil
                                                             scheme will look like, how it will function and
      stage will depend on whether a Concept
 functionality of the scheme.
 interceptors. The open graded sub-base
      Design has been provided and the level of
                                                             confirm any additional information provided
 provides 30% void storage which is
 An urban renewal project in the city will
                                                             since Concept Design Stage.
      information included at that stage.
 require a different approach to the visual
 of maintenance into the future.
 quality than a simple SuDS design for a
      plan form, confirming site layout and SuDS
 suburban layout.  confirmed by a flow control and a low level   The design information should be provided in
 Completing a cost comparison for permeable
      infrastructure together with a SuDS Design
 pavement demonstrates the wider
 SuDS components are cost effective when   Statement presenting all information that
 considerations of drainage, surfacing and
 compared to conventional drainage but cost   cannot be conveyed on plan.
 savings are only realised through good SuDS   engineering profiles that have to be
 considered.
 design.
      8.8.2  Outline Design – information checklist
 A good example of cost effective SuDS   Evidence for the cost effectiveness of
 design is the use of permeable pavement as   Information recommended in the ASA Practical
 SuDS can be found here: http://www.
 a replacement for impermeable surfaces. The   susdrain.org/resources/evidence.html  Guidance
 cost of the profile construction is marginally
         ■  Flood Risk Assessment (FRA) – a review              ■  ground investigation review
          of critical elements
                                                                ■  evidence of third party agreement for
 63   8.7  Management of the SuDS resource    ■  Outline Design Strategy Statement  consent to discharge or agreement in   64
                                                                principle.
 The future maintenance of SuDS is influenced   In other locations a SuDS feature can     ■  Outline Design Plan – layout
 by design. Wherever possible the idea of   contribute to landscape infrastructure e.g.
 ‘passive maintenance’ should be considered   the ‘rain garden’ or ‘bio retention’ element in     ■  the plan will incorporate preliminary
          landscape proposals
 with SuDS components integrated into the   design.
 everyday management.
 Wherever possible maintenance should be
      Additional information to inform evaluation of the scheme:
 Although there will be situations where   allocated to site care rather than SuDS

 dedicated SuDS components are appropriate   management.
 e.g. a pond or wetland, many SuDS features     ■  topographical information and flow route     ■  sensitive receptors for runoff where
 This reduced dedicated maintenance   analysis                  appropriate e.g. SSSIs
 can be incorporated into multifunctional
 obligation can sometimes be reduced to just
 space e.g. courtyards, play basins and     ■  destination and discharge route of rainfall     ■  offsite works that may be required
 checking inlets, outlets and control
 recreational space.  via infiltration or runoff
 structures.                                                    ■  general maintenance principles

 Design Note :     ■  infiltration investigation results where     ■  design life of any products used and
          appropriate
 Well designed SuDS are not ‘land hungry’ in that they can be integrated into both hard and   requirements for potential replacement.
 soft landspace spaces which are available within development. Making SuDS cost effective     ■  existing utilities plan confirming existing
 reinforces the requirement to consider SuDS layout at Concept Design stage.  watercourses or sewer locations




 London Borough of Newham SuDS D & E Guide                                                     © 2018 McCloy Consulting & Robert Bray Associates  London Borough of Newham SuDS D & E Guide                                                     © 2018 McCloy Consulting & Robert Bray Associates
   64   65   66   67   68   69   70   71   72   73   74