Detailed Design  9.5.5.2  Attenuation and long term storage                                                            Approach 2                                                                                                   Detailed Design

           Approach 1

           For Approach 1, some runoff must be
                                                                                                                             Where volumes cannot be managed to
                                                                                                                             predevelopment status, then outflow rate
           retained on site for a longer period after
                                                                                                                             should be controlled to a maximum of Qbar
           attenuation storage has emptied to mitigate
                                                                                                                             rate (which is equivalent to a 1 in 2 year or
           for the increased runoff volume generated by
                                                                                                                             Qmed which is used by FEH methods) for all
           the development. (NSTS S4)
           There are a number of ways to reduce and
                                                                                                                             rainfall event plus climate change allowance.
           manage the volume of runoff generated by                                                                          rainfall return periods up to the 1 in 100 year
           development as follows:                                                                                           This is the approach most commonly utilised
                                                                                                                             by industry at present due to simplicity of

              ■  Rain harvesting - Where it can be demonstrated that the harvesting system will be in use for                analysis, but can result in a greater storage
               the majority of time and demand exceeds supply, 50% of the rain harvesting volume can be                      requirement due to more restricted outflow
                                                                                                                             rates. (NSTS S6)
               offset against the long-term storage volume requirements. (BS 8515:2009)

              ■  Natural Losses – For SuDS components which provide natural losses a 5mm reduction can
               be applied to rainfall depths to account for interception losses. To demonstrate potential for
               sufficient interception losses, a ratio of ‘SuDS space’ to ‘developed area’ of 1:4 would be
               considered acceptable by LPAs.  Where SuDS components are unlined, some infiltration may                                                                                                   Riverside Court, Stamford.
                                                                                                                                                                   Permeable pavement delivers a controlled flow of clean water to
               occur even if rates are very low. These additional losses can be offset against the long-term
                                                                                                                                                                         landscape canal and rill features and to the River Welland.
               storage volume requirements.
  85                                                                                                                                                                                                                                      86
              ■  Separate area of storage - A separate area of storage can be provided. There are no set
               procedures on how frequently long term storage is utilised.




           It is prudent for areas which serve other              long term storage basins within pond
           purposes such as carparks or playing fields            complexes the frequency of fill may be much

           not to be inundated on a regular basis.                more regular - i.e. they will be inundated for
                                                                  rainfall events less than 1 in 30 year.
           The 1 in 30 year event is suggested as the
           point at which these areas would be first              Outflow from Long Term storage area should
           utilised for storage.                                  be via infiltration or a controlled discharge
                                                                  rate of 2 l/s/ha.
           In other locations such as raingardens and




                                                        Design Note:
             Infiltration tests where low rates of infiltration are anticipated may have to be specified over a
                                               period greater than 24 hours