Detailed Design  9.5.6  Managing runoff rates from                                                                Detailed Design

 Brownfield sites

 On Brownfield sites (also known as Previously
 Developed Land or PDL), if infiltration of the 1
 in 100 year rainfall event is not possible, the
 rate of discharge should be reduced to
 greenfield runoff rates. Where greenfield
 rates cannot be achieved, the designer must

 demonstrate why reduction in rate is not
 achievable. The designer will be required to
 demonstrate that they have explored all
 options for storage including the use of
 storage on roofs (e.g. blue-green roofs),
 permeable pavements, and the use of
 appropriately designed underground storage.
 (NSTS S3 and S6.)

 Not all planning applications comprise a
 complete redevelopment of the site, and only
 a small parcel of the overall site may be
 planned for re-development. On such
 occasions LLFA will not expect the entire
 87                                                                                                                88
 development to be returned to greenfield
 runoff status.

 In these circumstances LLFA will not accept

 the combining of the greenfield runoff rate
 for the development parcel with the existing
 impermeable runoff rate from the remainder                  Designers should provide the following:
 of the site when the designer is undertaking
 storage calculations.                                          ■  the net increase in impermeable area

 The existing development remaining intact                      ■  greenfield runoff rates are calculated
 and the parcel of land proposed for                            based on the area of the redevelopment
 development should be treated separately in                    parcel and not the wider development
 terms of calculations and drainage strategy.
                                                                ■  storage requirements for additional
                                                                impermeable area based on outflow
                                                                controlled to greenfield rates for the
      Facing: The Islington, Ashby Grove Raingarden.
      A raingarden for a single property with control           development parcel.
      tube and overflow that can manage the 1 in 100
      year return period rainfall event.