Page 95 - Wyre DESIGN & EVALUATION
P. 95
Lamb Drove, Cambourne, Cambridgeshire. Detailed Design
Levels of pathways and roads can be adapted to allow for a simple cascade of flow from one SuDS
component to the next in the event of exceedance or inlet blockage.
Facing: At this development flow rates have not
been managed within the conveyance system,
requiring rock reinforcement of the swale to Below: The amenity plan basin and low flow 90
reduce erosion. channel have a flow control before water
continues along a conveyance swale.
Wyre Forest District Council SuDS D & E Guide © 2018 McCloy Consulting & Robert Bray Associates