Lamb Drove, Cambourne, Cambridgeshire.                                                                       Detailed Design
      Levels of pathways and roads can be adapted to allow for a simple cascade of flow from one SuDS
      component to the next in the event of exceedance or inlet blockage.




      Facing: At this development flow rates have not
      been managed within the conveyance system,
      requiring rock reinforcement of the swale to               Below: The amenity plan basin and low flow        90
      reduce erosion.                                               channel have a flow control before water
                                                                        continues along a conveyance swale.