Page 12 - AfrOil Week 50 2021
P. 12

AfrOil                                 PROJECTS & COMPANIES                                            AfrOil



       Eni, Côte d’Ivoire hold advanced talks on




       net-zero development of Baleine discovery






          CÔTE D’IVOIRE  THE Italian energy major Eni has held advanced   sustainable management and restoration of
                         discussions with Cote d’Ivoire’s heads of state   degraded natural ecosystems, along with agri-
                         and government on developing Africa’s “first   cultural development initiatives focused on the
                         net-zero oil and gas development” for Scope 1   cultivation of oil crops and the collection of nat-
                         and Scope 2 emissions, the company announced   ural waste and used cooking oil, which will be
                         on December 10.                      used as bio-feedstock for biorefineries (biogas,
                           Eni had previously committed to the full   biomethane), and the identification and possible
                         decarbonisation of all its products and processes   development of power production projects from
                         by 2050. Its net zero plan for Baleine – the largest   renewable or low-carbon sources, with a focus
                         discovery ever made in Cote d’Ivoire, this Sep-  on solar power.
                         tember – is a pioneering industry move.  The Baleine CI-101 block is operated by a
                           Eni estimates that Baleine could contain   consortium that includes Eni as the operator
                         in-place resources of more than 2bn barrels   and the national oil company (NOC) Petroci.
                         of oil and 2.4 trillion cubic feet (67.96bn cubic   Eni owns stakes in blocks CI-205, CI-501,
                         metres) of associated gas. It has committed to   CI-504 and CI-802, where it is also working with
                         a phased development strategy for the Baleine   Petroci. ™
                         field, through an accelerated development
                         (Phase 1) with start-up by 2023 that will allow
                         an optimised time-to-market.
                           “In parallel with the first phase, the full-field
                         studies will advance. The project will leverage
                         the best available technologies to minimise
                         GHG emissions, implementing high efficiency
                         plant solutions, process energy recovery and the
                         reduction and control of fugitive emissions,” Eni
                         said.
                           As part of the December 10 meeting, and
                         in order to promote decarbonisation in the
                         country, Eni and the Ivorian Ministry of Mines,
                         Petroleum and Energy signed a memorandum
                         of understanding (MoU) that provides for ini-
                         tiatives in the field of Natural Climate Solution
                         aimed at offsetting GHG emissions.
                           This will be achieved through the protection,   Gas from the Baleine field will be delivered to the domestic market (Image: Eni)



       ADM wins injection against



       NHNL over Barracuda oilfield






            NIGERIA      LONDON-LISTED junior ADM Energy has   (OML) 141.
                         won an interim injunction against the Nige-  The deal’s structure saw ADM acquire 51% of
                         rian firm Noble Hill-Network Lt (NHNL) in a   Karra Oil Noble Hill (KONH), which, via a 70%
                         dispute over the Barracuda oil discovery in the   interest in NHNL, holds a risk-sharing contract
                         Niger River Delta.                   covering Barracuda (North West OML 141),
                           ADM had struck a deal in April to acquire   operated by Emerald Energy.
                         a material, indirect stake in the 73mn barrel oil   NHNL notified KONH in November of a
                         discovery, located in Bayelsa state and covered   dispute over its 70% stake in the firm. ADM and
                         by a risk-sharing contract carved out of Emerald   KONH then began proceedings against NHNL
                         Energy Resources-operated Oil Mining Licence   at the Federal High Court of Nigeria in Lagos.



       P12                                      www. NEWSBASE .com                      Week 50   15•December•2021
   7   8   9   10   11   12   13   14   15   16   17