Page 11 - MEOG Week 31 2021
P. 11

MEOG                                  PROJECTS & COMPANIES                                            MEOG


       Turkey nears start of new Black




       Sea exploration campaign






        TURKEY           TURKEY is planning to start new exploratory  of gas was announced by Ankara in 2020 after
                         drilling in the Black Sea in late 2021 or early  exploration conducted using the drillship
                         2022, Energy and Natural Resources Minister  Fatih. In June, Turkey announced another 135
                         Fatih Dönmez has said.               bcm of gas. Officials said it was identified in the
                           Seismic research at the Sakarya Gas Field,  Amasra-1 well of Sakarya.
                         which extends to 11,000 square kilometres, has   In June, Turkish President Recep Tayyip
                         been completed, according to the minister.   Erdogan announced that the country’s NOC
                           “Turkey imports about 70% of the energy  stuck gas with its Amasra-1 exploration
                         resources it needs and these include oil and  well, adding 135bn cubic metres of gas to the
                         petroleum products as well as natural gas. And  game-changing Sakarya discovery declared last
                         Turkey imports 98% of the natural gas it con-  year.
                         sumes, which is around 50 to 55 billion cubic   The Amasra-1 well took the total volume of
                         metres per year,” Donmez noted.      gas reserves discovered by Turkish Petroleum
                           Turkey has claimed a discovery of 540 bcm  Corp. (TPAO) at the Black Sea gas field over the
                         of gas in the Sakarya field so far and says it will  past year to 540bcm.
                         be exploited by 2023 to alleviate the need for gas   Dönmez announced the start of drilling at
                         imports for the following 10 years. Analysts have  Amasra-1 in mid-April. It is one of a 10-well
                         noted there has been independent verification of  drilling campaign designed to achieve first gas by
                         the size of the discovered resource.  2023 at a rate of 3.65bcm per year and a further
                           Turkey lit the first Sakarya gas flare on July  30 wells will be drilled to reach an annual plateau
                         28 in a ceremony attended by President Recep  of 15bcm by 2025.
                         Tayyip Erdogan.                        Local media have begun quoting an antici-
                           The Sakarya resource, say officials, amounts  pated flow rate of 5-10bcm in 2023, though no
                         to Turkey’s largest gas find. An initial 405 bcm  explanation for the increase has been provided.™
















































       Week 31   04•August•2021                 www. NEWSBASE .com                                             P11
   6   7   8   9   10   11   12   13   14   15   16